Notice of Violation from Insp on 901016-1126.Violation Noted:Failure to Follow Maint Order 89-SPS-0039 by Replacing Circuit Breaker 52-2A14 Instead of Circuit Breaker 52-1A14
ML20024F901
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/17/1990
From: Beverly Clayton
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20024F891 List:
References
50-155-90-22, NUDOCS 9012270118
Download: ML20024F901 (1)


Text

y

]

)

' NOTICE OF VIOLATION Consumers Power Company Docket No. 50-155 As a result of the inspection' conducted October 16 through November 26.-1990, and in accordance with 10 CFR Part 2, Appendix C - General Statement of Policy and Procedure for NRC Enforcement Actions (1990), the following violation was identified:

Section 6.8.1 of the Technical Specifications states in part, " Written procedures shall,be established, implemented and maintained for all structures, systems, components and safety actions defined in the Big Rock

. Point Quality List."

Section 5.1. of Administrative Procedure Volume 1,-Procedure 3.2.1 " Maintenance Order Processing" Rev. 10, dated July 24, 1990, states in part, " The Maintenance-Order is used for controlling.the activities, communicating essential facts to the repairmen,~ and documenting and recording work activity."

-Contrary to the above, on November 2, 1990, maintenance and operations-

. personnel failed to follow Maintenance Order 89-SPS-0039 when they replaced circuit breaker 52-2A14, instead of circuit. breaker 52-1A14 which was required

-by the maintenance order, This is a Severity Level'IV violation (Supplement I).

Pursusnt to the provisions of 10 CFR 2,201, youare required to submit.to this-

' office within thirty days of the date of'this Notice a written statement or

-explanation in reply, including for each violation (1)-corrective action taken' and the results' achieved; (2) corrective action to be taken to avoid further violations; and.(3) the date when ful1~ compliance will be. achieved.

Consideration may be_given to extend your-response time for good cause shown, t

[

'DEC:.17 50 g

Dated.

Brent Clayton/ Chief

. Reactor Projects Branch-2.