Forwards Insp Rept 50-483/90-17 on 901022-26 & 1105-09 & Notice of Violation
ML20024F849
Person / Time
Site: Callaway 
Issue date: 12/21/1990
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20024F850 List:
References
NUDOCS 9012270042
Download: ML20024F849 (3)


See also: IR 05000483/1990017

Text

-

]

g

'7

1

-

..

l

l

l

sr

(IEC 211990

'

.,

,

Docket No. 50 483'

Union Electric Company

ATTN: Mr. D. F. Schnell

Senior-'Vice President - Nuclear

. Post- Office Box 149 Mail Code 400

St, Louis, M0' 63166

1

iGentiemen:

This letterLrefers to the.special' maintenance team inspection performed by

Mr.: J. _H. Neisler and others ~ of this office on October 22 -through 26,- and -

<

November 5 through 9, 1990.

This inspection examined activities at Callaway

a

- Nuclear' Power Plant Unit l' as authorized by NRC.0perating License.No. NPF-30.

The-inspection-findings were discussed with you and others of your staff on

-November 20,t1990.

'

'I

The inspection was conducted to assess and; evaluate-your support to:and!

.

implementation'of maintenance to assure that plant structures, systems, and

3

components' reliably : perform on demand.

Various' activities were-evaluated to.-

-

-determine if maintenance was' accomplished, effective,'and adequately assessed

'

by,your own. quality. verification process.

iThe enclosed copy of our inspection report. identifies specific areas-examined;

iduring the inspection. .Within these areas, the inspection consisted'ofJa

selective l examination of-procedures- and representative records, observations

and interviews with your. personnel.- In an attempt!to fo'cus on_those

activities-that are most risk significant,JinsightsLfrom the:Callaway Nuclear

Power Plant Probabilistic Risk Assessment study, performed by'the NRC, were

used to select systems.and-' components?important;tossafety.

-

,

-0verall, .the inspection ' team concluded that implementation of the-maintenance

l

'

- program at -Callaway Nuclear Power Plant was good'.

Section 4.0-of the .

'

inspe_ction report _ provides a; synopsis..of the effectiveness: of your maintenance ^

programs,

i

_

The< team identified: strengths as well as weaknesses in1 implementation of the

maintenance programs. 'Some of the most significant strengths were:' excellent-

i

c

control of corrective and. preventive maintenance backlog; a. comprehensive

l

l~

predictive 'measurementLprogram using' state of the art techniques;- and an

excellent program for trending component failures and repe.titive quality

-,

L

control findings.

Significant weaknesses identified were:

inadequate control of contractors

resulting in the_ use of'an unqualified welder on safety related work, lack of -

an effective maintenance and surveillance program for emergency' lighting and-

inadequate control of work packages to assure work instructions are used at

the work location.

(k

9012270042 901221

'

DR

ADOCK 050

3

/ p/

li

,a_..__.-

-,

_

.

_.

,

.

DEC 211996

Union Electric Company

2

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the' enclosed Notice.

A written response

is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in-the NRC Public Document Room.

The response directed by this letter and the

accompanying Notice are not subject to the clearance procedures of the Office

of Management and Budget as required by the Paperwork Reduction Act of 1980,

PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

CL2"AL X m ,

c; 77 g, y;777

/

T. O. Martin, Director

/

Division of Reactor Safety

Enclosures:

1.

Notice of Violation

2.

Inspection Report No.

50-483/90017(DRS)

cc w/ enclosure:

G. L. Randolph, General Manager,

Nuclear Operations

J. V. Laux, Manager Quality

-Assurance

Tom P..Sharkey, Supervising

Engineer, Site Licensing

l

DCD/DCB (RIDS)

OC/LFDCB

!

'

Resident Inspector, RIII

Region IV

Resident Inspector, Wolf-Creek

K. Dray

l

Chris-R. Rogers, P.E.

Utility Division, Missouri

Public Service Commission

CFA Inc.

t

l

Gerald Charnoff, Esq.

Thomas Baxter, Esq.

R. A. Kucera, Deputy Director,

Department of Natural Resources

4]&;

. I,I, /[

RIII

RIII

RIII

RIII

RIII

PJ II

......SEE ATTACHED CONCURRENCE......

Lu )

l

Neisler/lc Burgess

Hague

Schumacher Ring

/ Wright

Martin

l

12/ /90

12/ /90

12/ /90

12/ /90

12/ /90 12/M /90

Y2/2 /90

.

.

.

Union Electric Company

2

my

g [.

. . . , ,

_

.m ,

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice.

A written response

is required.

In accordance with 10 CFR 2.790 of the Commission's regulations,

a copy of this letter, the enclosures, and your response to this letter will

be placed in the NRC Public Document Room. The response directed by this

letter and the accompanying Notice are not subject to the clearance procedures

of the Office of Management and Budget as required by the Paperwork Reduction

Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

T. O. Martin, Director

Division of Reactor Safety

Enclosures:

1.

Notice of Violation

2.

Inspection Report No.

50-483/90017(DRS)

cc w/ enclosure:

G. L. Randolph, General Manager,

Nuclear Operations

'

J. V. Laux, Manager Quality

Assurance

Tom P. Sharkey, Supervising

Engineer, Site Licensing

DCD/DCB (RIDS)

OC/LFDCif

Resident Inspector, RIII

Region IV

Resident Inspector, Wolf Creek

K. Drey

Chris R. Rogers, P.E.

Utility Division, Missouri

Public Service Commission

CFA,-Inc.

Gerald Charnoff, Esq.

Thomas Baxter, Esq.

R. A. Kucera, Deputy Director,

Department of Natural Resources

'le

. rd S$, fcII{ % N f htl(&

QR )

MJQdk.u- .Q742

RIII

RII

flII

RIII

RIII

RIII

Neisler//

Burgess F flague

Scff63cher Ring

Wright

Martin

12//f/90

12//f/90

12/70/90

12/l?/90

12 & /90 12/ /90

12/ /90