Forwards Insp Repts 50-424/90-28 & 50-425/90-28 on 901027-1123.Violations Noted
ML20024F846
Person / Time
Site: Vogtle  
Issue date: 12/13/1990
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20024F847 List:
References
NUDOCS 9012270037
Download: ML20024F846 (3)


See also: IR 05000424/1990028

Text

-

. - _

-

- - _

_ _ - - _ _ -

_ _ _ - _ _

_ _ _ _ _ _ _ _

'

.

DEC13 1%0

Docket Nos. 50-424, 50-425

License Nos. NPF-68, NPF-81

Georgia Power Company

ATTN: Mr. W. G. Hairston, 111

Senior Vice President -

Nuclear Operations

P. O. Box 1295

Birmingham, AL 35201

Gentlemen:

$UBJECT:

NOTICE OF VIOL ATION

(INSPECTION REPORT NOS, 50-424/90-28 AND 50-425/90-28)

This refers to the Nuclear Regult. tory Commission (NP.C) inspection conducted by

B. R. Bonser on October 27 - November 23, 1990.

The inspection included a

review of activities authorized for your Vogtle f acility. At the conclusion

of the inspection, the findings were discussed with those members of your

staff identified in the enclosed inspection report.

Areas exam'.ned during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice.

We are concerned about the violation because both of the failures to follow

procedure led to Engineered Safety Feature (ESF) actuations. We note that you

have recognized procedural compliance as a significant problem and are taking

steps to reduce the number of errors.

Both of the inadvertent actuations of

safety related equipment, however, unnecessarily placed the plara in an

unplanned configuration.

Fortunately, neither instance led to unsafe

operation.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

in your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrenc.. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In

accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

litle 10, Code of federal Regulttions, a copy of this letter and the

enclosures wiil be placed in the NRC Public Document Room.

The response directed by this letter ond the enclosures are not subject to the

clearance procedures of the Office of Managemen+ and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

4

90122/003/ 901213

ADOCK 000

4

t

gDR

,

- - - - -

--

-

-+-

m

+-

_z,

n

--y_--

as..___

--w-

a

-

4

.

Georgia Power Company

2

DEC 13 1990

Should you have any questions concerning this letter, please contact us.

Sincerely,

$

M /FC N n:Ciu

/(en fT-

'

yy

/

Alan R. Herdt, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

Inspection Reoort

cc w/encis:

R. P. Mcdonald

Executive Vice President-Nuclear

Operations

Georgia Power Company

P. O. Box 1295

Birmingham, AL h201

C. K. McCoy

Vice President-Nuclear

Georgia Power Company

P. O. 1295

Binningham, AL 35201

W. B. Shipman

General Manager, Nuclear Operations

Georgia Power Cempany

P. O. 1600

Waynesboro, GA 30830

J. A. Bailey

Manager-Licensing

Georgia Power Company

P. O. Box 1295

'

Birmingham, AL 35201

D. Kirkland, Ill, Counsel

,

Of fice of the Consumer's

Utility Council

Suite 225, 32 Peachtree Street, NE

Atlanta, GA 30302

Office of Planning and Budge.'

_

Room 615B

270 Washington Street, SW

Atlanta, GA 30334

(cc w/encls cont'd - see page 3)

.

_.

.-

- -

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ._-___ _ _ __ _ - _______-____ - - _ _ _ _ - ____ _

_ - ___

j

'

.

1

j

i

Georgia Power Company

3

,

DEC13 1930

cc w/encls:

(Continued)

!

Office of the County Commissioner

l

Burke County Commission

Waynesboro, GA 30830

t

.

Lonice Barrett, Commissioner

1

Department of Natural Resources

205 Butler Street, SE, Suite 1252

,

Atlanta, GA 30334

l

j

Thomas Hill, Manager

Radioactive Materials Program

Department of Natural Resources

878 Peachtree St., NE., Room 600

Atlanta, GA 30309

Attorney G.'neral

. Law Department

132 Judicial Building

Atlanta, GA 30334

Dan Smith

Program Director of

,

Power Production

Oglethorpe Power. Corporation.

-

100 Crescent Centre

Tucker, GA 30085

Charles A. Patrizia Esq.

Paul, Hastings, Janofsky & Walker

<

12th Floor-

1050 Connecticut Avenue, NW

Washington, D. C.

20036

bec w/encls:

S. Sparks, RIl

D. Hood, NRR

i

K. Brockman, Rll

A. Herdt, Rll

Document Control Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

P. O. Box 572

Waynesboro, CA 30830

l

Ril:0RP

RII:

P

Md

SSparks

KB ekman

12/it/90

12/@/90

! L--

- _ - _ - - _ - - . _ - . - . _ . - - . - , -.

. - . - . - - . . . . . . - - . - - - . - . - . - , , . _ ~ . -

. . . .