Forwards Insp Repts 50-361/90-37 & 50-362/90-37 on 901001-1115.Violations Re Misalignment of Valves & Inoperability of Safety Equipment Under Consideration for Escalated Enforcement Action
ML20024F804
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/05/1990
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20024F806 List:
References
EA-90-201, NUDOCS 9012210127
Download: ML20024F804 (3)


See also: IR 05000361/1990037

Text

l

.

' p tico

UNITED STATES

'

[* ' o.g

  • *

NUCLEAR REGULATORY COMMISSION

[

g

REGION V

h

-l

1450 MARI A L ANE, SUITE 210

C

.p

WALNUT CRE E K, CALIFoRNI A 94596

%

g

DEC

61993

Docket Nos. 50-361, 50-362

License Nos. NPF-10, NPF-15

EA No.90-201

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California 92718

Attention:

Mr. Harold B. Ray

Senior Vice President, Nuclear

Gentlemen:

This refers to the special inspection conducted by Messrs. A. L. Hon and

C. W. Caldwell of this office on October 1 through November 15, 1990.

This

inspection included a review of activities authorized for your San Onofre

Units 2 and 3.

At the conclusion of the inspection, the inspectors discussed

their findings with Mr. H. E, Morgan and other members of your staff identi-

fied in the enclosed report.

Areas examined during this inspection are described in the enclosed inspec-

tion report.

Within these areas, the inspection consisted of selective

examinatiors of procedures and representative records, interviews with

-

personnel, and observations by the inspectors.

Based on the results of this inspection, two apparent violations were

identified and are being considered for escalated enforcement action in

accordance with the " General Statement of Policy and Procedure for NRC

Enforcement Actions" (Enforcement Policy), 10 CFR Part 2 Appendix C (1990).

These two licensee-identified Technical Specifications violations involved

misalignment of valves that resulted in inoperability of important safety

.

equipment. One affected the emergency core cooling and containment cooling

sub-systems in Unit 3, and also affected the Unit's containment integrity.

The second violation affected the auxiliary feedwater system in Unit 2.

Since these violations are being considered for escalated enforcement action,

no Notice of Violation is presently being issued for these inspection find-

ings.

In addition, please be advised that the number and characterization of

the apparent violations described in the enclosed inspection report may change

as a result of further NRC review.

An enforcement conference to discuss these apparent violations has been

scheduled for December 11, 1990. The purposes of this conference are to

discuss the apparent violations, their causes and safety significance; to

provide you the opportunity to point out any errors in our inspection report;

to provide an opportunity for you to present your proposed corrective

/ /

)

actions; and to discuss any other information that will help us determine the

appropriate enforcement action in accordance with the Enforcement Policy.

9012210127 901205

PDR

ADOCK 05000361

T -/

- -

O

PDR

[=

'

t& w

,

.

-

.

' '

s

,,

--

2

You will be advised by separate correspondence of the result of our delibera-

tions on this matter.

No response regarding these apparent violations is

required at this time,

in accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Sincerely,

)k1

R. P

immerman, Director

Division of Reactor Safety

and Projects

Enclosure:

Inspection Report Not. 50-361/90-37 and 50-362/90-37

cc w/ enclosure:

D. J. Fogarty, Executive Vice President, Nuclear Engineering & Operations

H. E. Morgan, Vice President and Site Manager

R. L. Krieger, Station Manager

State of California

.

S

l

_.

_ _ _ _ - _ _ _ _

.

,

,

..

/,

,,-

..

-3-

bec w/ copy.of. enclosure:

.

Docket File

J. Lieberman

Project Inspector

M. Slosson

Resident inspector

M. Virgilio

G. Cook

J. Dyer

B. Faulkenberry

L. Kokajko

J. Martin

A. Johnson

P. Johnson

bec w/o enclosure:

M. Smith

N. Western

~J. Zollicoffer

REGION V

KPerh9s

rp 12

C

ell

Mdh son

SRichards

/90

12/

90

12/3 /90

12/q/90

12/d /90.

BEQ(IEST COPY ] BEQUES1 COPY ] fEQUEST _ COPY ]/. REQyEST COPY ~

REQUEST COPY ]

(YES/ / NO.

14E1 / N0

](YES)/ NO

'] YES/ / NO

YES / N0

]

~

Ado llpsbn

n

(9

RZininerman

JMarjdn

[)l.#g :12/Lf /90

12/ 5/90

12// /90

EQttEST COPY l1 YES) /JE-QyEST COPY ] REQUEST COPY ]

g

, g[j.f

YES! / NO

NO

] YES / N0_ j

I-

S D TO POR

]-

'

YE

/ NO

<]

,