Forwards IE Insp Rept 50-397/83-27 on 830601-30.No Noncompliance Noted
ML20024F681
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/18/1983
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Carlisle C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20024F682 List:
References
NUDOCS 8309090573
Download: ML20024F681 (2)


See also: IR 05000397/1983027

Text

r

"

(

.

Docket No. 50-397

AUG 181983

Washington Public Power Supply System

P. O.' Box 968

Richland, Washington 99352

Attention:

Mr. C. S. Carlisle

Program Director

Gentlemen:

Subject: NRC Inspection-

'\\*

This refers to the-inspection conducted by Mr. A. D. Toth of this office,

during June 1-30, 1983 of activities authorized by NRC Construction Permit

s

No. CPPR-93, and to the discussion of findings held by Mr. Toth with Mr. Carlisle

,and other members of your staff at the conclusion of the inspection.

^

Areas _ examitied during this inspection are described in the enclosed

_in,spection report. Within'these areas, the inspection consisted of selective

,

examinations-of procedures and_ representative records, interviews with

^

personnel, and observations by the inspector. The enclosed inspection report

also describes. topics and. conclusions discussed at the June 21, 1983 site

j

f ," meeting regarding the, construction reverification program scope.

"

JNo items of noncompliance' with NRC requirements were identified within the

scope:of this inspection.

Id acco'rdance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed.in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

applicacion:to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the

~

requirements of 2.790(b)(1).

,

%OI

.

8309090573 930818

%k

PDR ADOCK 05000397

'

PDR

G

,

,

.

Washington Public Power Supply System

2

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

b 3 D #e(

0. M. Sternberg, Chief

Reactor Projects Branch 1

Enclosure:

NRC Inspection Report

No. 50-397/83-27

cc w/o enclosure:

H

B. Glasscock

J. D. Martin

G. C. Sorensen

bec: RSB/ Document Centrol Desk (RIDS)

Distributed by RV:

State of WA (Lewis)

Resident Inspector (Feil /Toth)

Martin

RV/j k

TOTH . -

H4IS

DOI)D,

S $

RG

b- o

&

8/.

83

8//-/83

8/g/83

8/gb/83

l

'

- _ - _ _ - _ _ _ _ _ _ _ - _ .