Suppls Response to NRC Re Violations Noted in IE Insp Repts 50-324/82-16 & 50-325/82-16.Although Program for Detecting Trends & Reviewing Failed Equipment Established by 821231,implementation Still Ongoing
ML20024F587
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/12/1983
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20024F580 List:
References
NUDOCS 8309090497
Download: ML20024F587 (2)


Text

r-

'g'.*

2 Cp&L C

cp A

(?-O Carolina Power & Light Company go no Brunswick Steam Electric Plant

-o P. O. Box 10429 f-Jd Southport, NC 28461-0429

.o Q

0 9.-

3,h Augu t 12, 1983 a

5 cp FILE: B09-13510E SERIAL:

BSEP/83-2697 Mr. James.P. O'Reilly, Administrator U. S. Nuclear Regulatory Commission Region II, Suite.3100 101 Marietta Street N.W.

Atlanta,.GA 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 and DPR-64 SUPPLEMENTAL RESPONSE TO INFRACTIONS OF NRC REQUIREMENTS

Dear Mr. O'Reilly:

.. Carolina Power & Light (CP&L). Company committed in its supplemental response to IE Inspection Report 50-324/82-16 and 50-325/82-16, dated November 29, 1982, to have a formal program for detecting trends and reviewing failed equipment established and implemented by December'31,'1982. Although the program was _ established by this date, -implementation is still ongoing.

The BSEP trending program utilizes the Nuclear Plant Reliability Data-System (NPRDS) which is' currently undergoing a transition in management [from Southwest Research Institute-(SRI) to the Institute of Nuclear Power Operations (INPO)] and a scope expansion requiring additional training for its users.

Personnel assigned to the trending program and NPRDS reporting have attended the INPO sponsored workshop on the NPRDS reportable scope and are currently training in interactive data entry which will provide more timely failure 1

-8309090497 830826 PDR ADOCK 05000324 G

PDR

)

s*

jr

- f Mr. O'Reilly 1

I It is expected that full reporting to NPRDS and the trending program. failure trending program will be complete by fraplementation of the equipmentIn addition, the scope of the equipment to be trended will December 31, 1983.

be expanded in accordance with the INPO schedule for NPRDS reportable scope expansion.

Very truly yours, s4 C. R. Dietz, General Manager Brunswick Steam Electric Plant RMP/dj/LETDJ5 Enclosura cc:

Mr. R. C. DeYoung NRC Document Control Desk I

- - - - - -, _ _ - _ _ _ _ _ _ _ _