August 18, 1983
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
SUBJECT: REPORT NOS. 50-327/83-15 AND 50-328/83-15
This refers to the routine safety inspection conducted by Mr. W. W. Peery of this
office on July 18 - 22, 1983, of activities authorized by NRC Operating License
Nos. DPR-77 and DPR-79 for the Sequoyah facility and to the discussion of our
findings held with Mr. P. R. Wallace, Assistant Plant Manager, at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were
disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of the letter. Such application must be consistent with the requirements
of2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
(Original signed by DMVerrelli)
D. M. Verrelli, Chief
Project Branch 1
Division of Project and
Resident Programs
Enclosure:
Inspection Report Nos. 50-327/83-15
and 50-328/83-15
cc w/ encl:
(See page 2)
8309090420 830818
\\\\
PDR ADOCK 05000327
G
[Q/
1
._.
_.
.
'
.
4
Tennessee Valley Authority
2
August 18, 1983
i
cc w/ encl:
H. J. Green, Director of Nuclear Power
G. G. Stack, Project Manager
C. C. Mason, Plant Superintendent
.
D. L. Williams, Jr., Supervisor,
,
Licensing Section
J.-E. Wills, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
J. W. Anderson, Manager
Office of Quality Assurance
bcc w/ enc 1:
NRC Resident Inspector
Document Management Branch
State of Tennessee
i
l
,
%
l
4
!
i
I
(
-RII-
RII
RII
/
RII
ig
AFGibso'n
PFredehickson
D
elli
WW
- sa
K
r
-08//183
!
/
/%8/i?/83
08/G83
08/7/83
08/g /83
/
f
.
-.
.
-
- .
-
-
.
- . - -
. -
..