ML20024F476

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/83-35 on 830701-31.No Noncompliance Noted
ML20024F476
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/17/1983
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Carlisle
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20024F477 List:
References
NUDOCS 8309090415
Download: ML20024F476 (1)


See also: IR 05000397/1983035

Text

.

4

AUG 171983

Docket Nos. 50-397

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention:

Mr. C. S. Carlisle

Program Director

Gentlemen:

- Subj ect:

NRC Inspection

This refers to the inspection conducted by Mr. A.-D. Toth of this office,

during July 1-31, 1983, of activities authorized by NRC Construction Permit

No. CPPR-93, and to the discussion of findings held by Mr. Toth with Mr. R.

Johnson and other mem'aers of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

'

In accordance with -10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date'of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the

requirements of 2.790(b)(1).

!

.

4

l

13 0

\\\\

8309090415 830817

PDR ADOCK 05000397

PDR

O

. _ . .

-

. _ .

.

.

"'

]

<

.

.

.

MG 1719o3

Washington Public Power Supply System

-2-

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

s

V'

D. M. Sternberg, Chief

Reactor Projects Branch 1

Enclosure:

'NRC Inspection Report'

No. 50-397/83-35

cc w/o enclosures:

R. B. Glasscock, WPPSS

J. D. Martin, WPPSS

bec: RSB/ Document Control besk (RIDS)

Distributed by RV:

State of WA

-Mr. Martin

pink & green copies

Resident Inspector

docket file copy

(11

-)

.

I

l

TOTH/ dot'

_ W

UUDDS

STERNBERG

8/f[/83

8

/83

8//4/83

8/ 6 /83