ML20024F423

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-416/83-26 on 830627-0701 & Notices of Violation & Deviation
ML20024F423
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/29/1983
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Richard J
Mississippi Power & Light Co
Shared Package
ML20024F385 List:
References
NUDOCS 8309090366
Download: ML20024F423 (2)


See also: IR 05000416/1983026

Text

.-

fOtO

'es

.

.

-

.

JUL 2 91983

.

Mississippi Power and Light Company

ATTN: Mr. J. B. Richard

Senior Vice President, Nuclear

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

SUBJECT: REPORT N0. 50-416/83-26

This refers to the routine safety inspection conducted by Mr. W. H. Miller, Jr.,

of this office on June 27 - July 1,1983, of activities authorized by NRC License

No. NPF-13 for the Grand Gulf facility. Our preliminary findings were discussed

with Mr. C. K. McCoy, Plant Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

During the inspection it was found that certain activities under your license

appeared to deviate from commitments to the Commission and have safety

j

significance. This item is identified in the Notice of Deviation enclosed

herewith as Appendix B.

Please provide us in writing within 30 days of your

receipt of this letter your comments including a description of corrective

actions that have been or will be taken, corrective actions which will be taken

to avoid further deviations, and the date your corrective actions were or will

be completed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

'in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosures,

and your reply will be placed in NRC's Public Document Room upon completion

of our evaluation of the reply.

If you wish to withhold information contained

in the inspection report, please notify this office by telephone or include

a. written application, to withhold information contained therein, in your

response. Such application must be consistent with the requirements of

.2.790(b)(1).

8309090366 830902

PDR ADOCK 05000416

0-

PDR

_

,

.

_

-

_

_ _ _ .

.

. . _ ,

-

o

.

.

-_

Mississippi Power and 1.ight Company

2

JUL 2 91993

.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

<

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

D. M. Verrelli, Chief

Project Branch 1

Division of Project and--

'

Resident Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3.

Inspection Report No. 50-416/83-26

-

cc w/encls:

~

'

J. F. Fager, Vice President

Engineering and Construction

Middle South Services, Inc.

C. K. McCoy, Plant Manager

bec w/encis:

NRC Resident Inspector

Document Management Branch

State of Mississippi

i

l

,

!

Y g

-RII

[

b/

RII

RII

II

RII

'

WH

ler:sa

Con en 9M

ARHerdt

DQ

k

DMVegrelli

83ypp

07/g/83

'Q3',

07/g /83

07

07

/83

07/4 /

-

a ubn-

pa

1/f/9