ML20024F358

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-537/83-08 on 830719-22.No Noncompliance Noted
ML20024F358
Person / Time
Site: Clinch River
Issue date: 08/09/1983
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Brewington P
ENERGY, DEPT. OF, CLINCH RIVER BREEDER REACTOR PLANT, PROJECT MANAGEMENT CORP., TENNESSEE VALLEY AUTHORITY
Shared Package
ML20024F359 List:
References
NUDOCS 8309090310
Download: ML20024F358 (2)


See also: IR 05000537/1983008

Text

-

r

o

.

j*

02

,.

AUG 091983

U.S. Department of Energy

Project Management Corporation

Tennessee Valley Authority

ATTN: Mr. Percy Brewington, Jr.

Acting Director, CRBRP Project

P. O. Box U

Oak Ridge, TN 37830

Gentlemen:

SUBJECT: REPORT N0. 50-537/83-08

This refers to the routine safety inspection conducted by Mr. C. R. McFarland

of this office on July 19 - 22, 1983, of activities associated with your

application for an NRC Construction Permit for the Clinch River Breeder

Reactor Plant and to the discussion of our findings held with Mr. D. Hedges,

Assistant Director for Quality Assurance, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were

disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein w! thin thirty days of the

date of the letter. Such application must be consistent with the requirements

of2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you..

Sincerely,

H. C. Dance, Chief

Project Branch 2

Division of Project and

l

Resident Programs

l

Enclosure:

(See Page 2)

8309090310 830809

i

PDR ADOCK 05000537

\\\\

Q/

G

PDR _ .

,

.

,.d c'

U.S. Department of Energy

2

AUG 091983

Enclosure:

Inspection Report No. 50-537/83-08

cc w/ enc 1:

P. J. Gross, Assistant Director

for Public Safety

D. Hedges, Assistant Director

for Quality Assurance

bec w/ enc 1:

Document Management Branch-

State of Tennessee

T. King, CRBRP P0, NRR

J. Stone, 0IE

.

R. Bangart, RIV

,

l

.

i

I

l

l-

l

.

l

i..

!

.

l

RII

II

(

RI

--

RII_gahad:sa

or]d HCDaf.

C

CRMc

MUpyight

.AR erdt

l

9g3

08/#/83

_.08/p/83

- 08/%/83

08/ /83

, . .

.

. - . . .. - .-.-.- - .-.-.- , -.

-

. -

.

. -

-