ML20024F282

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-373/83-31 & 50-374/83-30 on 830801-02 & 09-10.No Noncompliance Noted
ML20024F282
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/25/1983
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20024F283 List:
References
NUDOCS 8309090178
Download: ML20024F282 (2)


See also: IR 05000373/1983031

Text

.

.

AUG 2 5 1983

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN: .Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago,=IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. K. D. Ward

and R. L. Cilimberg of this office on August 1-2 and 9-10, 1983, of activi-

ties at LaSalle-County Station, Unita 1 and'2, authorized by NRC Operating

License No. NPF-11 and NRC Construction Permit No. CPR-100 and to the

'

discussion of our findings with Mr. J. Woldridge and others of your staff

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

lwill be placed in the NRC Public Document Room unless you notify this office,-

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of-this letter.

Such application must be consistent with the re-

quirements of 2.790(b)(1) . If we do not hear from you in this. regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

8309090170 830025

PDR ADOCK 05000373

G

PDR

,

/hl'

.

.

Commonwealth Edison Company

2

AUG 2 51983

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original signed by W. S. Littic"

W. S. Little, Chief

Engineering Branch 2

Enclosure:

Inspection Reports

'

No. 50-373/83-31(DE) and

No. 50-374/83-30(DE)

cc w/ encl:

D. L. Farrar, Director

of Nuclear Licensing

D. L. Shamblin, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Superintendent

'

G. J. Diederich, Station

Superintendent

R. H. Holyoak, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

' Phyllis Dunton, Attorney

General's Office, Environmental

- Control Division

4

i

s

i

,

RII

RIII

RIII

RIII

RIII

b&

f,&h

]

/

Walker

CI m erg

Littly/sv

Da ie son

08/2b/83'

z(f) ^

fl9r

,

f)

Q.Q

f i(?)

,

,

l

- . . . .

-

,. , . , ,

+ , . - . , - . ~ , , , . , . . , ,

- - - , . - - -,----,

n,

- ,,,

,,

~. , . . , . .

~ , ,

-