Monthly Operating Rept for Jul 1983
ML20024F087
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 08/01/1983
From: Kelly W, Thornberry R
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8309080215
Download: ML20024F087 (5)


Text

i t

OPERATING DATA REPORT DOCKET N0.

50-275 DATE 08/01/83 COMPLETED BY W.J. Kelly TELEPHONE (805)S95-7351 OPERATING STATUS 1.

Unit Name:

Diablo Canyon Unit 1 2.

Reporting Period:

July 1983 Notes 3.

Licensed Thermal Poewr (MWt):

166.9 4.

Nameplate Rating (Gross MWe):

1170 5.

Design Electrical Rating (Net MWe):

1084 6.

Maximum Dependable Capacity (Gross MWe):

1134 7.

Maximum Dependable Capacity (Net MWe):

1084 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe): 10.

Reasons For Restrictions, It Any:

Suspended Low Power Test License This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 0

0 0

12.

Number Of Hours Reactor Was Critical 0

0 0

13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 0

0 0

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 0

0

17. Gross Electrical Energy Generated (MWH) 0 0

0 18.

net Electrical Energy Generated (MWH) 0 0

0

19. Unit Service Factor N/A
20. Unit Availability Factor N/A
21. Unit Capacity Factor (Using MDC Net)

N/A

22. Unit Capacity Factor (Using DER Net)

N/A

23. Unit Forced Outage Rate N/A
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i 25.

It Shut Down At End Of Report Period, Est. Date of Startup:

Sept., 1983 (fuel load)

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY November 1983 INITIAL ELECTRICITY November 1983 COMMERCIAL OPERATION Februa ry 1984 8309080215 830801 PDR ADOCK 05000275 R

PDR

[ GFy,'[

DC0044 4

a AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.

50-275 UNIT Oiablo Canyon Unit 1 DATE 08/01/83 COMPLETED BY W.J. Kelly TELEPHONE (805)595-7351 MONTH July 1983 UAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 0

1/

0 2

0 18 0

3 0

19 0

4 0

20 0

6 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

l 12 0

28 0

13 0

29 0

14 0

30 0

lb o

31 0

16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DC0044 5

UNIT SHUIDOWNS AND POWER REDUCTIONS DOCKET NO.

50-275 UNIT NAFE DIABLO CANYON UNIT DATE 08/01/83 COMPLETED BY W.J. KELLY TELEPHONE (805)S95-/351 REPORTFDNTH JULY 1983 Method of Licensee Cause & Lorrective Duration Shutting Event System Component Action to No.

Date Typet (Hours)

Reason 2 Down Reactor Report #

Code 4 Codeo Prevent Recurrence 810928 F

0 H

4 81-002/01T ZZ ZZZZZZ Halted fuel loading preparations upon discovery of seismic calculation errors.

Reanalysis and reviews are being conducted in accordance with Commission's instructions.

1 2

3 4

F:

Forced Reason:

Method:

Exhibit G - Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NUREG-0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source H-Other(Explain)

DC0044 6

)

Y MONTHLY NARRATIVE REPORT l

OF OPERATION AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of' July 1983. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the plant Technical Specifications.

There is no significant operating experience of major safety related maintenance to report.

No challenges to the PORV's or safety valves have been made.

Furthermore, no changes have been made in the Offsite Dose Calculation Procedure, the Environmental Radiological Monitoring Procedure, or any radioactive waste treatment systems.

i I

i j

?

DC0044 3 L

. ~..

~..

d PACIFIC GAS AND ELECTR,IC C O M PANY DIABLO CANYON POWER PLANT pgg I

PO. Box 56 Avila Beach, Califomia 93424 - (805) 595-7351 RC.THORNBERRY PLANT MANAGER August 1, 1983 Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 RE: Docket No. 50-275 License No. DPR-76 Monthly Operating Report for July,1983 Gentlemen:

Enclosed are the completed monthly operating report forms for Diablo Canyon Unit 1 for July 1983. This report is submitted in accordance with Section 6.9.1.10 of our Technical Specifications.

Sincerely, 4

H. 0 f R. C. THORNBERRY RCT:pim j

Enclosures cc Mr. J. B. Martin, Regional Administrator Region V - USNRC

\\

I i

DC0044 1 fg, 1,1

.