Requests Assistance in Performing Environ Rept Acceptance Review.Results Requested by 831010
ML20024F035
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/02/1983
From: Adensam E
Office of Nuclear Reactor Regulation
To: Ballard R, Rolonda Jackson, Lear G
Office of Nuclear Reactor Regulation
References
NUDOCS 8309080140
Download: ML20024F035 (1)


Text

,-

6

~@

f3*

DIS UTION

~ L+

A wS

~Decket~Nos. 50-424/425 O

NRC PDR PRC System SEP 21964 LB #4 r/f EAdensam MMiller MDuncan Docket Nos. 50-424/425 TNovak DEisenhut/RPurple IEMORANDUH FOR:

R. E. Jackson, Chief, Geosciences Branch, DE G. E. Lear, Chief, Structural & Geotechnical Engineering Branch, DE R. L. Ballard, Chief, Environmental and Hydrologic Engineering Branch, DE L. G. Hulman, Chief, Accident Evaluation Branch, DSI F. Congel, Chief, Radiological Assessment Branch, DSI W. H. Regan, Jr., Chief, Site Analysis Branch, DE W. P. Gammill, Chief, Heteorology and Effluent Treatrent Branch, USI FROM:

Elinor G. Adensam, Chief 4

Licensing Dranch No. 4 Division of Licensing

SUBJECT:

ACCEPTANCE REVIEW OF THE V0GTLE, UNITS 1 AND 2 ENVIRONMENTAL REPORT Georgia Power Company tendered an application for an operating license on June 30, 1983. The Environmental Report was tendered August 31, 1983.

Your assistance in performing an acceptance review is requested. Copies are now being distributed.

If you have not received a copy by September 12, 1983, please have your reviewers contact Melanie Miller (X24259).

You are requested to forward the results of your acceptance review by October 10, 1983.

If you have identified additional information that will be required for your detailed review, this should be described in in the format of requests for additional information using the NRC staff nurbering systcu that identifies the cognizant branch /section and the number of each request from that branch /section. No Environmental Project Manager or Environmental Review Coordinator will be assigned to this project. Therefore, any requests for additional information resulting from your review should be submitted to T. Novak from yourAD as is done in the safety review.

kDP OC Elinor G. Adensam, Chief OOO 4

C PDR Licensing Branch No. 4 Division of Licensing

/

a~mu4

.6/'

..E,h,,.

W-> MM.d.'e.b........e.b...

e,n,,am,,,,,