Amend 89 to License DPR-32,changing Tech Specs for Insp Interval for Snubbers
ML20024E947
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/23/1983
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20024E948 List:
References
NUDOCS 8309070471
Download: ML20024E947 (4)


Text

.

+#ps asc u

o UMTED STATES

. EI

' [,,

NUCLEAR REGULATORY COMMISSION 3

g t

p.

WASHINGTON, D. C. 20$55

~

'+, *.....$

VIRGINIA ELECTRIC AND POWER COMP"ANY DOCKET NO. 50-280 SURRY POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 89 License No. DPR-32 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Virginia Electric and Power Company (the licensee) dated August 5, 1983, as supplemented August 9 and August 16, 1983 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of Act, and the rules and regulations of the Commission; 4

C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.-

l 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-32 is hereby amended to read as follows:

f309070471 830823 PDR ADOCK 05000200 P

PDR

I 4

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment N:. 89, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION C.,

'S e

. Varga, Chief ( h #1 Operating Reactors Bra Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: August 23, 1983 i

- #w ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 89 TO FACILITY OPERATING LICENSE NO. DPR-32 i

DOCKET NO. 50-280 Revise Appendix A as follows:

Remove Page Insert Page 4.17-2 4.17-2 4

4 e

c w

-wy+

y-

---e

-g

.g

,, yc - - -

e.,. *

--r-y

-,-r e

---y

.myee. v r

w--,-m

.-w

TS 4.17-2 1.

i l

No. Inoperable Snubbers Subsequent Visual per Inspection Period Inspection Period

  • i i

l 0

18 months : 25:

1 12 months : 25 2

6 months 25%

3,4 124 days : 25%

5,6,7 62 days : 25% #

8 or more 31 days : 25: '

2.

The snubbers may be categorized into two groups: Those access-c451e and those inaccessible during reactor operation. Each group may be inspected independently in accordance with the above schedule.

B.

Visual Inspection Acceptance Criteria 1.

Visual inspections shall verify:

a.

That there are no visible indications of damage or i= paired operablity, b.

Attachments to the foundation or supporting structure are l

secure, and c.

In those locations where snubber movement can be manually induced without disconnecting the snubber, that the snubber has freedom of movement and is not frozen up.

  • The inspection interval shall not be lengthened more than one step at a ti=e.
  1. The currene inspection period for Unit 1 may be extended to September 21, 1983.

Amendment No. 89