Forwards IE Insp Rept 50-305/83-10 on 830623-0815.No Noncompliance Noted
ML20024E879
Person / Time
Site: Kewaunee 
Issue date: 08/23/1983
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Giesler C
WISCONSIN PUBLIC SERVICE CORP.
Shared Package
ML20024E880 List:
References
NUDOCS 8309070166
Download: ML20024E879 (2)


See also: IR 05000305/1983010

Text

.

n

AUG 2 31983

Docket No. 50-305

Wisconsin Public Service

Corporation

ATTN:

Mr. C. W. Giesler

Vice President

Nuclear Power

Post Office Box 1200

Green Bay, WI 54305

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. L. Nelson

of this office during the period of June 23 through August 15, 1983, of

activities at the Kewaunee Nuclear Power Plant authorized by NRC Operating

License No. DPR-43 and to the discussion of our findings with Mr. D. C. Hintz

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the re-

quirements of 2.790(b)(1).

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

8309070166 830823

DR ADOCK 05000305

PDR

~f 201di

..

.

Wisconsin Public Service

2

Corporation

AUS 2 3 S83

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/S/fGd'A)

3lff -fl

W. D. Shafer

Projects Branch No. 2

Enclosure:

Inspection

Report No. 50-305/83-10(DPRP)

cc w/ enc 1:

D. C. Hintz, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Ness Flores, Chairperson

Wisconsin Public Service

Commission

.

!

,

i

!

RIII

RIII

RIII

,

T

J@ck

NOld[

Nel

/db

a

Shafer

08/22/83

y.23[J3

i'7'3't

i

L