ML20024E546
| ML20024E546 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 08/01/1983 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| Shared Package | |
| ML20024E548 | List: |
| References | |
| NUDOCS 8308150286 | |
| Download: ML20024E546 (2) | |
See also: IR 05000333/1983015
Text
.
.
.
AUG 01 1983
Docket No. 50-333
Power Authority of the State of flew York
James A. FitzPat~.ick Nuclear Power Plant
ATTN: ffr. Corbin A. ficNeill, Jr.
Resident Itanager
P. O. Box 41
Lycoming New York
13093
Gentlemen:
Subject:
Inspection 50-333/83-15
This refers to the routine, safety inspection conducted by Mr. J. Linville of
this office on June 1-30, 1983 at the J. A. FitzPatrick Nuclear Power Plant.
Scriba, New York and by Mr. R. McBrearty of this office on May 24-26 and
June 1-3, 1983 at the Electric Power Research Institute Nondestructive Exam-
ination Center, Charlotte, North Carolina of activities authorized by NRC
License No. OpR-59 and to the discussions of our findings held by Mr. L. Doerflein
with yourself and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were obse:ved.
.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placod in the NRC Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold infomation contained therein within thirty days of the date
of this letter. Such application must be consistent with the requirements of
2.730(b)(1). The telephone notification of your intent to request withholding,
or any request for an extension of the 10 day period which you believe necessary,
should be made to the Supervisor, Files, Hail and Records, USNRC Region I, at
(215)337-5223.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
oriainal sisned By:
'
Richard W. Starostecki, Diroctor,
Division of Project and Resident
Programs
)
8308150286 830801
PDR ADOCK 05000333
i
O
OFFICIALRECORD COP!
1
i
e
e
Power Authority of the State
2
AUG 01 1983
of New York
Cnclosure:
liRC Region I Inspection Report
Number 50-333/83-15
cc w/ encl:
L. W. Sinclair, President and Chief Operating Officer
J. P. Bayne, Executive Vice President-Nuclear Generation
A. Klausmann, Vice President-Quality Assurance and Reliability
H. C. Cosgrove, Quality Assurance Superintendent
G. H. Wilverding, Chairman, Safety Review Comittee
C. H. Pratt, Assistant General Counsel
NRC Licensing Project Manager
Department of Public Service State of New York
Public Document Room (PDR)
local Public Document Room (LPDR) (NSIC)
Nuclear Safety Information Center
HRC Resident Inspector
State of New York
bec w/ encl:
Region I Docket Room (with concurrences)
SeniorOperationsOfficer(w/oencis)
Section Chief, DPRP
)),
RI:D
.J -
RI:DP P T
RI:D P<.HBK
RI:EPB:RAMcBrear
JWA/typis
JWA/typis
E,g
JWA/ typist
t
07/14/83
07/14/83
07/14/83
.D
-
0FFICIAL RECORD COF%]