Supplemental Application for Amend to License DPR-71, Supplementing 830428 & 0616 Submittals Proposing Change to Tech Spec Table 3.7.5-1 (Page 3/4 7-12) to Reflect Correct Number for Control Rod Drive Return Line Snubbers
ML20024E532
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/10/1983
From: Howe P
CAROLINA POWER & LIGHT CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20024E534 List:
References
LAP-83-304, NUDOCS 8308150272
Download: ML20024E532 (2)


Text

..e i I

C LAP-83-304 Carolina Power & Light Company AUG 101983 l Director of Nuclear Reactor Regulation At tent. ion: Mr. D. B. Vassallo. Chief Operating Reactors Branch No. 2 Division of Licensing United States Nuclear Regulatory Commission Washington, DC 20555 '

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 SUPPLEMENTAL REQUEST FOR LICENSE AMENDMENT MISCELLANEOUS PLANT MODIFICATIONS

Dear Mr. Vassallo:

SUMMARY

In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power & Light Company (CP&L) hereby requests a revision to the Technical Specifications (TS) for the Brunswick Steam Electric Plant, Unit No. 1 (Brunswick-1). The revision supplements our June 16, 1982 and April 28, 1983 submittals concerning miscellaneous TS revisions.

DISCUSSION On June 16, 1982, CP&L submitted a request for TS revisions to address the deletion of certain safety-related hydraulic snubbers and the installation of several other miscellaneous plant modifications. All of these modifications were scheduled to be completed during the Brunswick-1 Reload 3 outage. Due to delays in beginning this outage, the lengthy duration of the outage, and changes in the work scope of the outage, CP&L found it necessary to revise the proposed TS revisions provided in our June 16, 1982 submittal (refer to CP&L's supplemental request for TS revisions dated April 28, 1983, Serial No. LAP-83-100) .

Enclosure 1 of CP&L's April 28, 1983 request provides the background information for TS revisions relating to the implementation of certain NUREG-0619 requirements for Brunswick-1. During the Brunswick-1 Reload 3 outage, CP&L partially removed the control rod drive (CRD) return line and installed a temporary cap. This CRD return line removal resulted in the deletion of only four hydraulic snubbers instead of five snubbers as stated in our April 28, 1983 request. Accordingly, CP&L herein encloses a revised TS page 3/4 7-12 for Brunswick-1 that reflects the deletion of the correct j number of CRD return line snubbers.

8308150272 830810 PDR ADGCK 05000325 PDR P

gl 411 Fayetteville Street

  • P. O. Box 1551
  • Raleigh, N. C. 27602 m uwmma : w:me n 1 :n m
  • n

1 l

ADMINISTRATIVE INFORMATION The enclosed TS page supersedes the same numbered page provided in our April 28, 1983 submittal. The revisions on the enclosed TS page are indicated by vertical lines in the right-hand margin. Since this request is a supplement to our April 28, 1983 and June 16, 1982 requests, we have determined that no additional license amendment f ee is required.

Should you have any questions concerning this submittal, please contact our staff.

Very truly yours, O i (d .

P. W. Howe Vice President Brunswick Nuclear Project WRM/ lev (7323WRM)

Enclosure P. W. Howe, having been first duly sworn, did depose and say that the information contained herein is true and correct to his own personal knowledge or based upon information and belief.

CLtCduk W My commission expires: 0-d3-87 cc: Mr. Dayne H. Brown Radiation Protection Branch Division of Facility Services Department of Human Resources Mr. D. O. Myers (NRC-BSEP)

Mr. J. P. O'Reilly (NRC-RII)

Mr. S. D. MacKay (NRC) k