b/H 0
a
July 12, '383
Docket No. 50-266
Docket No. M -301
Wisconsin Electric Power Company
ATTN: Fir. Sol Burstein
Executive Vice President
Power Plants
231 West riichigan
tiilwaukee, WI 53201
Gentlemen:
This refers to the routine safety inspection conducted by tiessrs.
R. L. Hague and B. E. Fitzpatrick of this office on April 1 - Flay 31, 1983,
of activities at Point Beach Nuclear Power Plant, Units 1 and 2, authorized
by NRC Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion
of our findings with tir. J. J. Zach at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the re-
quirements of 2.790(b)(1).
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
8308080242 830712
PDR ADOCK 05000266
Y Ol9l
G
_.
. __.
.
..
_ . . _
.
(-
%
6
Wisconsin Electric Power Company
2
July 12, 1983
We will gladly discuss any questions.you have concerning this inspection.
Sincerely,
&
W. D. Shafer, Chief
Projects Branch 2
Enclosure:
Inspection Report
No.-50-266/83-07(DPRP);
No. 50-301/83-07(DPRP)
cc w/ encl:
J. J. Zach, Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Peter Anderson, Wisconsin's
Environmental Decade
Ness Flores, Chairperson
Wisconsin Public Service
Commission
RII
RIII
i-
t
J
jp
Shafer
07/06/83
. . - . - . - - . _ _ , - . -
- . - . - . . . . - - _ - - . _ . - - . , - - . . . - , , - . . -