Forwards IE Insp Repts 50-266/83-07 & 50-301/83-07 on 830401-0531.No Noncompliance Noted
ML20024D807
Person / Time
Site: Point Beach  
Issue date: 07/12/1983
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20024D808 List:
References
NUDOCS 8308080242
Download: ML20024D807 (2)


See also: IR 05000266/1983007

Text

b/H 0

a

July 12, '383

Docket No. 50-266

Docket No. M -301

Wisconsin Electric Power Company

ATTN: Fir. Sol Burstein

Executive Vice President

Power Plants

231 West riichigan

tiilwaukee, WI 53201

Gentlemen:

This refers to the routine safety inspection conducted by tiessrs.

R. L. Hague and B. E. Fitzpatrick of this office on April 1 - Flay 31, 1983,

of activities at Point Beach Nuclear Power Plant, Units 1 and 2, authorized

by NRC Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion

of our findings with tir. J. J. Zach at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the re-

quirements of 2.790(b)(1).

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

8308080242 830712

PDR ADOCK 05000266

Y Ol9l

G

PDR

_.

. __.

.

..

_ . . _

.

(-

%

6

Wisconsin Electric Power Company

2

July 12, 1983

We will gladly discuss any questions.you have concerning this inspection.

Sincerely,

&

W. D. Shafer, Chief

Projects Branch 2

Enclosure:

Inspection Report

No.-50-266/83-07(DPRP);

No. 50-301/83-07(DPRP)

cc w/ encl:

J. J. Zach, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Peter Anderson, Wisconsin's

Environmental Decade

Ness Flores, Chairperson

Wisconsin Public Service

Commission

RII

RIII

i-

t

J

jp

Shafer

07/06/83