ML20024D625
| ML20024D625 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/25/1983 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-27396-BSK, DER-83-40, NUDOCS 8308050376 | |
| Download: ML20024D625 (3) | |
Text
f I:
Eg13,,g w
Arizona Public Service Company j.
///y*,I P.O BOX 21666. PHOENIX, ARIZONA 85036 Fi! 1: <:c July 25, 1983 ag,g,; I, ' "-
ANPP-2739 6-BSK/RQT U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chie f Reactor Projects Branch 1
Subject:
Interim Report - DER 83-40 A 50.55(e) Potentially Reportable Deficiency Relating to LPSI And CS Pump Motors Leaking Oil And Have Defective Wells File: 83-019-026 D.4.33.2 Re ference: Telephone Conversation between A. D'Angelo and R. Tucker-on June 29, 1983
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached. It is now expected that this information will be finalized by October 6,1983, at which time a complete report will be s ubmit ted.
Very truly yours, g CLLL GL E. E. Van Brunt, Jr.
APS Vice President, Nuclear Projects Management ANPP Project Director EEVBJr./RQT:rb Enclosure cc: See Page Two 8308050376 830725 PDR ADOCK 05000528
/l S
-. f,_? ?T_.
i
I
~
U..S. Nuclear Regulatory Commission Page Two f
cc:
Richard DeYoung, Director Office of Inspection and Enforcement-U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini J. A. Roedel.
D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339
~
INTERIM REPORT - DER 83-40 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNIT 1 I.-
Potential Problem
.The LPSI and CS Pump Motors "A" and "B" are discrepant as follows:
1.
Lower bearing leaking oil.
2.
Defective welds on the lower motor end brackets.
II.
Approach To and Status Of Proposed Resolution Bechtel engineering is corresponding with C-E, to provide reportability disposition, and technical justification for corrective action.
III. Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by October 6,1983.
t l
l l
1 l
I t
i l
1
.. -. - -