Interim Deficiency Rept DER 83-19 Re Improper Functioning of Pacific Scientific Safety Injection Sys Snubbers. Initially Reported on 830406.Addl Time Needed to Complete Final Rept.Final Rept Will Be Submitted by 830915
ML20024D564
Person / Time
Site: Palo Verde 
Issue date: 07/21/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-27290-RQT, DER-83-19, NUDOCS 8308050261
Download: ML20024D564 (2)


Text

m x

IVED Arizona Public Service Company jg dh[,,

P O. BOX 21666. PHOENIX ARIZONA 85036 fil : Sg 1

r SEgjg,,/f; July 21, 1983 ANPP-27290-RQT/BSK U.S. Nuclear Regulatory Commission

,Q Region V

/pu Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chie f Reactor Projects Branch 1

Subject:

Time Extension for Report - DER 83-19 A 50.55(e) Potentially Reportable Deficiency Relating to Safety Injection System Snubbers From Pacific Scientific Do Not Fuction Properly.

File: 83-019-026, D.4.33.2.

Re ference:

(A) Telephone Conversation between A. D'Angelo and R. Tuck.sr on April 6, 1983.

(B) ANPP -23646 dated May 3, 1983 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficeincy in Reference (A), and an Interim Report was transmitted by Reference (B), At that t ime, it was estimated that a Final Report would be available by August 1, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 15, 1983, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

{

COLL ntLL E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/RQT/rb cc:

See Page 2 8308050261 830721 PDR ADDCK 05000528

  1. 27 S

PDR

(n y

e e

U.S. Nuclear Regulatory Commission Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Pa tterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost J. Self Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 l

I l

i l

l i