ML20024D560
| ML20024D560 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/25/1983 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-27395-RQT, DER-82-61, NUDOCS 8308050253 | |
| Download: ML20024D560 (2) | |
Text
\\
[h Arizona Public Service Company 083 47,! [1f PO. BOX 2N6
- PHOENIX. ARIZONA 85036
- w NE6/,T,4,.
July 25,1983 ANPP-27395-RQT/BSK U.S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. D. M. Sternberg, Chie f Reactor Projects Branch 1
Subject:
Time Extension for Report - DER 82-61 A 50.55(e) Potentially Reportable Deficiency Relating to Reactor Coolant Pump Diffusor Ring-Cap Screws May Fail And Damage Pump File: 83-019-026, D.4.33.2.
Reference:
(A) Telephone Conversation between J. Eckhardt and G.
Duckworth on October 21, 1982 (B) ANPP-22368 dated November 22, 1982 (Interim Report)
(C) ANPP-23026 dated February 16, 1983 (Time Extension)
(D) ANPP-23278 dated March 17, 1983 (Time Extension)
(E) ANPP-23798 dated May 18, 1983 (Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A).
Interim Reports were transmitted by References (B) and (E), and Time Extensions were requested by References (C) and (D). Reference (E) gave an estimate that a Final Report would be available by July 25, 1983.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by October 20, 1983, when a complete report will be submitted.
There is no new information or change to the Interim Report at this time, t,"~~4
$ 2 '7 Very truly ours 529 Q
~
r 8N d-CLLL ri LLL E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/RQT/rb cc:
See Page 2
/o 8308050253 830725 PDR ADOCK 05000528 7 g y**
S PDR
m
}
U.S. Nuclear. Regulatory Commission Page 2 cc:
Richard DeYoung, Director
' Office 'of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli-S. R. Frost J. Self Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 i
I i
<