ML20024D556

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 50-341/83-08.FSAR Amend 49 Excerpt Re Offsite Radiological Monitoring Program & Acceptance Records for 46 Nuclear Utils Svcs Instructions,W/Util ,Provided
ML20024D556
Person / Time
Site: Fermi 
Issue date: 07/06/1983
From: Wells D
DETROIT EDISON CO.
To: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20024D545 List:
References
EF2-64-519, NUDOCS 8308050244
Download: ML20024D556 (52)


Text

'

Y C

o o

Donald A. Wells Manager OuaMy Assurance (3131 23/ % 57 i

2000 Second Aveoe 31 3-July 6, 1983 EF2 - 64,519 Mr. J. A. Hind U. S. Nuclear Regulatory Commission Region III 799 Rosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Hind:

Reference:

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341

Subject:

Region III Inspection Report No. 50-341/83-08 (DRMSP)

May 25, 1983 The attachments to this letter, as delineated below, are being submitted in response to open items contained in the referenced Inspection Report.

2.

Licensee Actions e.

Open Item 50-341/82-04 QA Audit of REMP Contractor Attached is a copy of a letter, EF2 - 64,672, July 5, 1983, closing the December 1982 audit of the NUS Pittsburgh laboratory.

f.

Open Item 50-341/82-04 NUS REMP Sampling and Analytical Work Instructions Attached are copies of the Acceptance Records for the 46 NUS Instructions applicable to the Fermi 2 REMP.

They have been approved according to procedures delin-eated in Detroit Edison Instruction NE 1.2.2 "Prepara-tion, Revision, and Control of Nuclear Engineering and Contractor Instructions".

g.

Open Item 50-341/82-04 FSAR Section 11.6 Attached is a copy of Amendment 49 to the Enrico Fermi Atomic Power Plant Unit 2 Final Safety Analysis Report which documents deletion of section 11.6 from the report.

g } Q @3 8308050244 830002 PDR ADOCK 05000341

.G PDR

. MfMfug W &@ t6di dig Co IM'4SP

I

-J. A. Hind July 6,.1983 EF2 - 64,519 Page 2 i

Should have any questions regarding the above, please contact I

Mr. George Trahey, (313) 586-5039.

l Very truly yours, f

onald A. Wells DAW /JCG/aa Attachments cc:

Mr. Richard DeYoung, Director i

Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission i

Washington, D.C.

20055 Mr. Bruce Little, Senior Resident Inspector U. S. Nuclear Regulatory' Commission 7450 North Dixie Highway Newport, Michigan 48166

?

1 i

7 I

Edison Ri?!n="-

July 1, 1983 EF2 - 64,672 Mr. Charles J. Marcinkiewicz Manager Radiological Laboratory NUS Corporation 5350 Campbells Run Road Pittsburgh, Pennsylvania 15205

Subject:

Quality Assurance System Audit of December, 1982 (NS-822)

Dear Mr. Marcinkiewicz:

We have reviewed your responses to our audit findings (see attached NE-83-462), including the revisions to your Quality Assurance Manual and Work Instructions, which we find to be satisfactory and acceptable.

This closes the audit NS-822.

Sincerely, g

e A. Alexiou Assistant Director i

Project Quality Assurance AA:mks Attachment cc:

T. A. Alessi E. F. Madsen L. E. Eix E. H. Newton W. J. Fahrner J. W. Nunley S. Ferencz J. D. Ryan J. C. Guillamin D. A. Wells J. E. Kepus PQA Audit Records P. J. Lavely EF2 Record Center W. V. Lipton

,rs,

"'. Detroit L-w

- - = > - vu La... ;.,. Ly l.

ma_ v _.,... -__..

Date:

June 30, 1983 NE-83-462 To:

S. K. Kavafian Senior QA Engineer From:

P. J. Lavely b>'

Corporate Health Physicist

Subject:

Resolution of Findings from DECO Audit (NS-822) of NUS Dated December 20-22, 1982 I have reviewed and biscussed the documentation of audit NS-822 with W. Lipton.

I have also reviewed NUS's responses to audit NS-822.

Specifically, my review included the following items:

Findings Responses QAF-NS-822-A PRL-83-082 (March 24, 1983)

QAF-NS-822-B PRL-83-143 (June 8, 1983)

QAF-NS-822-C.1-C.3 PRL-83-146 (June 9, 1983)

QAF-NS-822-D PRL-83-160 (June 28, 1983)

QAF-NS-822-E Observations 1-9 Concerns 1-3 I have determined that the corrective and remedial action taken by NUS in response to the Findings, Observations, and Concerns of audit NS-822 are complete and acceptable, f3L PJL:aa Attachment ec:

W. D. Gilbert-W. V. Lipton i

]

U.S. NUCLEAR REGULATORY COMMISSION a

DOCKET NO. 50-341 i

Enrico Fermi Atomic Power Plant Unit 2

.(

FINAL SAFETY ANALYSIS REPORT l

AMENDMENT 49 JUNE 1983 "n"J4"i"/;"A",^S R

(

Detroit Edison

s EF-2-FSAR 0

11.6 OFFSITE RADIOLOGICAL MONITORING PROGRAM

(

Intentionally deleted.

49 This material is no longer appropriate for inclusion in Section 11.6.

Applicable information on the Radiological Environmental Monitoring Program is included in Sections 3/4.12.1 a~nd 3/4.12.2 of the Technical Specifications.

(,

f i

i l

l

(

11.6-1 Amendment 49 - June 1983 l

i

NE - 1.2.2 Attcchment 9.4 s

Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD INSTRUCTION NUMBER P.O. 5.2.15.0 REVISION NUMBER 1

TITLE Quality Assurance in the Radiological Laboratory-General Guidelines PREPARED BY NUS Corporation Company Janunrv 19R3 Date 7/r/vT Date

NE - 1.2.2 Attcchment 9.4 s

Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD o

INSTRUCTION NUMBER P.O.5.2.15.2 REVISION NUMLER 1

TITLE Radiological Laboratory-Training PREPARED BY NUS Corporation Company May 1983 Date ACCEPTED b 4A M

d u.e 7/J'/F3 Date

NE - 1.2.2 s.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD r

INSTRUCTION NUMBER P.O.5.2.15.1 REVISION NUMBER 3

TITLE Radiological Laboratory Ornanization and Function PREPARED BY NUS Corporation Company May 1983 Date ACCEPTED B w

7 /6'/F3 Date

/

dL.

m NE - 1.2.2

=.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD INSTRUCTION NUMBER P.O.5.2.15.3 REVISION NUMBER 2

TITLE Receipt and Disposition of Samples PREPARED BY NUS Corporation Company May 1983 Date ACCEPTEDBYks)b

[t O

A

( Na$

[

yh-/F3 Date

NE - 1.2.2 g

Attcchment 9.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD INSTRUCTION NUMBER P.O.5.2.15.4 REVISION NUMBER 0

TITLE Receipt of Radioactive Sources, Standards, and Non-Environmental Samples PREPARED BY m,3 g g

Company; November 1982 Date y _/ b.

ACCEPTED B M I-

.A y/s'/83 Date

/

y e---


,,,--w-,...

,-._,,,g, p,-

p

-,-w--

NE - 1.2.2 Attcchment 9.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPIANCE RECORD INSTRUCTION NUMBER P.O.5.2.15.5 REVISION NUMBER 1

TITLE Document Control-Radiological Laboratory Work Instructions PREPARED BY NUS Corporation Company January 1983 Date ACCEPTED BY N d

/[, /,

-d.

7 N /r3 Date

/

/

\\

l l

i

,.-,e

-,y

-m

,-a.-

NE - 1.2.2.4

=

Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD INSTRUCTION NUMBER P.O.5.2.15.6 REVISION NUMBER 1

TITLE Data Review and Reporting PREPARED BY NUS Corporation Company May 1983 Date ACCEPTED B

(

//

O u+e 7/f/ks Date

/

1 i

I

NE - 1.2.2.4

=

Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD r

INSTRUCTION NUMBER P.O.S.2.15.7 REVISION NUMBER 0

TITLE Preparation of Standards, Tracers, and Carriers PREPARED BY NUS Corporation Company November 1982 Date ACCEPTED BY L

7/>'/F3 Date t

I

NE - 1.2.2 Attcchment 9.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPLANCE RECORD 9

INSTRUCTION NUMBER P.O.S.2.15.10 REVISION NUMBER o

TITLE Determination of Gross Aloha and Gross Beta Rndin. activity in Water PREPARED BY NUS Corporation Company November 1982 Date ACCEPTED B M b h

( Naye

[]hYT]

Date

^

<-r

-m----~

e - - - - --,

NE - 1.2.2.4 Page 1 of 1 l

CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD 1

INSTRUCTION NUMBER P.O.5.2.15.15 REVISION NUMBER o

TITLE Operation of the Gas Proportional Counter LB 5100 PREPARED BY NUS Corporation Company November 1982 Date D

ACCEPTEDByN-(

//., -

7 /f/71 Date

.~.

NE - 1.2.2 Attechment 9.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPIANCE RECORD e

INSTRUCTION NUMBER P.O.5.2.15.16 REVISION NUMBER 0

TITLE Calculation of Gross Alpha and Gross Beta Radioactivity in Water PREPARED BY NUS Corporation Company November 1982 Date ACCEPTED BY d.-

/ M_

e 7 /_6'// 3 Date 1

e m-,

,,----g

~

NE - 1.2.2 Attcchment 9.4 Page 1 of 1 i

i CONTRACTOR INSTRUCTIONS ACCEPfANCE KECORD l

r l

INSThUCTION NUMBER P.O.S.2.15.20 REVISION NUMBER o

TITLE Operation of the Packard Tri-Carb 3000 Liquid Reintillation Counter PREPARED BY NUS CORPORATION Company November 1982 Date ACCEPTED BY\\ L d, /. O.

[

7/n%3 Date i

O

- -, -,, +. -, -,

---+-w v...-.

c

,--,,-.-,,------,,,,,w.....

NE - 1.2.2 Attcchment 9.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCT.P t'ANCE adLORD e

INSTRUCTION NUMBER P.O.5.2.15.23 REVISION NUMBER o

TITLE Determination of Tritium in Water by Liould Scintillatin Counting PREPARED BY NUS Corporation Company November 1982 Date ACCEPTED BY ll

/y, was

't 7lJ~/~F3 Date

.--4.

-.s p

-.,r,

__--y

+.,

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INS 1RUCT10NS ACCEPTANCE RECORD INSTRUCTION NUMBER P.O.5.2.15.24 REVISION NUMBER 0

TITLE Calculation of Tritium Activity by Liquid Scintillation Method PREPARED BY NUS Corporation Company November 1982 Date ACCEPTED BYkd/,

/4!/[ M e

Mr/r3 Date 4

l l

l l

I NE - 1.2.2.4 Page 1 of 1 l

CONTRAC-f0R INSTRUCTIONS ACCEPTANCE RECORD INSTRUCTION NUMBER P.O.5.2.15.27 REVISION NUMBER 0

TITLE Determination of I-131 in Milk or Water by Cas Proportional Counting PREPARED BY NUS Corporation Company November 1982 Date ACCEPTED B k 4 v

[f b

[

29 s

Wf/r3 Date

NE - 1.2.2.4 4

Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD o

INSTRUCTION NUMBER P.O.5.2.15.28 REVISION NUMBER 0

TITLE Calculation of Iodine-131 Activities in Milk or Water PREPARED BY NUS Corporation Company November 1982 i

Date ACCEPTEDB['*Qt-O M

'Name

~(

7Jr/73 Date r

I

- - -,. _,., -. =. _ - -. _ _ _ _. -. - -,

,m

,.,,-,.,.,----,,,,--,-rn.--

NE - 1.2.2 Attcchment 9.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD o

INSTRUCTION NUMBER P.O.5.2.15.29 REVISION NUMBER 0

TITLE Preparation of Soil and Sediment for Analysis PREPARED BY NUS Corporation Company November 1982 Date ACCEPTEDBY\\8b d

O A

M i

7/r/F s Date

/

l l

l

~ ~ - - - - -

r---T-w-

e-t

-v-e--

-~'r~--w7 e- - - - - -

r e,m+-

-, - - - - + - - - - - + = -

m

NE - 1.2.2 Attcchment 9.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPIANCE RECORD r

INSTRUCTION NUMBER P.O.5.2.15.30 REVISION NUMBER 0

TITLE Preparation of Vegetation and Food Materials for Analvais PREPARED BY NUS Corporation Company November 1982 Date us.

?/TJF3 Date

/

_m

NE - 1.2.2.4 Page 1 of I CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD INSTRUCTION NUMBER P.O.5.2.15.42 REVISION NUMBER 0

j TITLE Performance Checks on the Liquid Scintillation Counter.

Packard 300C PREPARED BY NUS Corporation Company November 1982 Date ACCEPTEDB.YMil //

O

_/7 xa 7/f/F3 Date i

-c.--

...n.

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD o

INSTRUCTION P.O.5.2.15.43 0

NUMBER REVISION NUMBER Performance Check of Gas Proportional Counters (Tennelec LB-5100)

TITLE NUS Corporation PREPARED BY Company November 1982

- Date

[g//[M g

ACCEPTEDBJ 6L Name 7/f~/FJ Date l

l l

l i

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD e

INSTRUCTION P.O.5.2.15.44 REVISION NUMBER 1

NUMBER TITLE Performance Check of Ge(Li) Gamma Spectrometry System PREPARED BY NUS Corporation Company May 1983 Date ACCEPTED BY LL-

[f

.h

.s 7 /i"/f3 Date l

{

l l

l l

f

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD r

INSTRUCTION NUMBER P.O.5.2.15.46 REVISION NUMBER 1

TITLE Routine Performanc;e Checks on the Teledyne 8300 TLD Reader PREPARED BY NUS Corporation Company May 1983 Date d,

O ACCEPTED BY L

7//~/8 Y Date 1

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD o

INSTRUCTION NUMBER P.O.5.2.15.47 REVISION NUMBER 0

TITLE Manual Calculation of Gamma Spectrometry Data 4

PREPARED BY NUS Corporation Company November 1982 Date ACCEPTEDBYNL d, / b Y

m 2/r/73 Date t

l l

l l _ _.. _ _. _.. _ _,

~., _ _ _ _.

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD o

INSTRUCTION NUMBER P.O.5.2.15.48 REVISION NUMBER 1

TITLE Calibration of Analytical Balances PREPARED BY NUS Corporation Company May 1983 Date ACCEPTED {PM

/ /N

~

7 ffYf.)

Date

/

f 3-

-.,r---

NE - 1.2.2 Attechment 9.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD F

INSTRUCTION NUMBER P.O.5.2.15.49 REVISION N'IMBER 1

TITLE Preparation and Analysis of CaSO (Dv) TLDs PREPARED BY NUS Corporation Company May 1983 Date ACCEPTED B lb

/ O MA Date l

l i

l

(

i I

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD F

INSTRUCTION P.O.5.2.15.50 0

NUMBER REVISION NUMBER Operational Check of Balances TIEE

~

NUS Corporation PREPARED BY Company May 1983 Date ACCEPTED BY,-

A-Nahe 7/i~/72 Date l

l l

l 1

~.

NE - 1.2.2

  • .4 Page 1 of I CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

^l l

INSTRUCTION NUMBER P.O.5.2.15.51 REVISION NUMBER 0

Preparation of Air Particulate Filters for Analysis-Alpha, Beta TITLE and/or Gamma Spectrometry g

PREPARED BY NUS Corporation Company November 1982 Date ACCEPTEDBYki8L d

M

[

Na.e 7/fff 3 Date

/

i i

l

=

l l

l l

NE - 1.2.2.4 Page 1 of I CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

'I INSTRUCTION NUMBER P.O.5.2.15.52 REVISION NUMBER o

TITLE Analysis of Charcoal Adsorption Cartridges for I-131 PREPARED BY NUS Corporation Company November 1982 Date ACCEPTED BY ft

/ (([

Name

(

7/.+

$0

/

Date i

i

NE - 1.2.2

..4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

'I l

INSTRUCTION NUMBER P.O.5.2.15.60 REVISION NUMBER 0

TITLE Acquisition and Data Analysis of High Resolution Gamma Spectra (Spectran F)

' Z. p-PREPARED BY NUS Corporation Company November 1982 Date ACCEPTED BY

<A-

[/ h Nede L

1/s-/F)

Date

/

1 l

l

._.---.._.7 7,

-,_.y r

~.

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

'E l

INSTRUCTION o

NUMBER P.O.5.2.15.62 REVISION NUMBER 1

TITLE Calibration of High Resolution Gamma Spectrometry Systems

-9, PREPARED BY_

NUS Corporation Company May 1983 Date h

ACCEPTEDBY\\TI

/t sa.e 7N~~/F3 Dat.

/

1 i

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD 1

l INSTRUCTION NUMBER P.O.5.2.15.64 REVISION NUMBER 0

TITI,g Calibration of Gas Proportional Counters PREPARED BY NUS Corporation Company November 1982 Date

\\

ACCEPTED BY Yll

[

/

D w

7/S'/73 Date

/

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

'I l

INSTRUCTION NUMBER P.O.5.2.15.65 REVISION NUMBER 0

TITLE Calibration of the Packard Liquid Scintillation Counter PREPARED BY NUS Corporation Company November 1982 Date ACCEPTED BY M il k

N _am, ff Date

/

1

\\

ItE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

'I l

INSTRUCTION NUMBER P.O.5.2.15.66 REVISION NUMBER 1

TITLE Calibration of Thermoluminescent Dosimeters for Environmental Monitoring

- 7;.

PREPARED BY NUS Corporation Company January 1983 Date ACCEPTED BY

[

.h

..ma,

7/r/73 Date l

l S

y


.,-__,.--._y.,ry.

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

^!

l INSTRUCTION NUMBER P.O.5.2.15.80 REVISION NUMBER 0

TITLE Completion of Sample Collection Field Log PREPARED BY NUS Corporation Company November 1982 Date ACCEPTEDBYNTA

[/

u

(

7/shs Date I

l 1

l l

l t

t

-. -.. -. - -~. -

NE - 1.2.2.4 Page 1 of I CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

'I INSTRUCTION NUMBER P.O.S.2.15.81 REVISION NUMBER 0

TITLE Maintenance of the RAC Universal Air Samplers

.3. r.-

PREPARED BY NUS Corporation Company November 1982 Date ACCEPTEDBYktl O

Name

{

7/r/73 Date

-r

.r,

NE - 1.2.2.4 Page 1 of I CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

^!

l INSTRUCTION NUMBER P.O.5.2.15.82 REVISION NUMBER 2

TITLE Calibration of the RAC Universal Sampler Using the Kurz Flow cattorator Model 544

--rg,

PREPARED BY NUS Corporation Company May 1983 Date ACCEPTED BY N L

/p 7 /s% >

Date

/

^

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD INSTRUCTION P.O.S.2.15.120 1

NUMBER REVISION NUMBER Collection of Air Particulate and Air Iodine Samples for the TITLE Fermi REMP

' - rp PREPARED BY NUS Corporation Company May 1983 Date ACCEPTED BI Ven

.e 7 />~/7 3 Date

NE - 1.2.2

  • .4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD I

INSTRUCTION NUMBER P.O.S.2.15.123 REVISION NLMBER 0

TITLE Water Sampling for the Fermi REMP PREPARED BY NUS Corporation Company November 1982 Date ACCEPTED BY\\4tl

[

O Name

~l 7 f/FJ Date

/

/

l l

l l

l l

l l

(

~

NE - 1.2.2.4 Page 1 of I CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

'I INSTRUCTION NUMBER P.O.5.2.15.124 REVISION NUMBER 1

TITLE Milk Sampling for the Fermi REMP

.=

v PREPARED BY NUS Corporation Company January 1983 Date i

ACCEPTED BY

(

/

4 Nam.

7-

?/r/r3 Date t

l e

a

-m-

<-m--

-.. ~, _, _,. _ -, - -.,,,

9 NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

'I INSTRUCTION P.O.S.2.15.125 NUMBER REVISION NUMBER 2

TITLE Fish Sampling for the Fermi REMP PREPARED BY NUS Corporation Company June 1983 Date ACCEPTED BY\\'Gk_

[/

O-

Nage, L

7k/rs Date

/

/

i l

l l

l l

l I

i l

i

\\

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

~!

r i

INSTRUCTION NUMBER P.O.5.2.15.126 REVISION NUMBER 1

TITLE Sediment Sampling for the Fermi REMP

5 NUS Corporation PREPARED BY Company May 1983 Date ACCEPTED BY #22b

[l O _,.

[

Name v/r/ce

/

Date

.r.

--e

~

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD

~

INSTRUCTION NUMBER P.O.5.2.15.127 REVISION NUMBER 1

TITLE Calculation of TLD Data for the Fermi REMP PREPARED BY NUS Corporation Company May 1983 Date ACCEPTED BY-ll-k/O wa.e>

7/>

93 Date

/

NE - 1.2.2 Attechment 9.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD 9

INSTRUCTION NUMBER P.O.5.2.15.128 REVISION NUMBER 0

TITLE Data Review and Non-Routine Reportine for the Fermi RFMP l

PREPARED BY NUS Corporation Company November 1982 Date ACCEPTED BY, f/l

./

O 7/r/[ r a aame Date

/

s NE - 1.2.2.t.

Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD F

INSTRUCTION NUMBER P.O.5.2.15.129 REVISION NUMBER 0

TITLE Annual Reports for the Fermi Preoperational REMP PREPARED BY NUS Corporation Company November 1982 Date ACCEPTED BY M,ik[/ /

.a.

i 7/r/73 Date

/

C NE - 1.2.2

'.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD 9

INSTRUCTION NUMBER P.O.5.2.15.130 REVISION NUMBER 1

TITLE Feed / Silage and Food Crop Sampling for the Fermi REMP PREPARED BY NUS Corporation Company May 1983 Date ACCEPTED BY elk

[

D d

uame 7 >/7 3 Date I

l l

l l

1

~.

}

NE - 1.2.2.4 Page 1 of 1 CONTRACTOR INSTRUCTIONS ACCEPTANCE RECORD e

INSTRUCTION NUMBER P.O.5.2.15.131 REVISION NUMBER 0

TITLE Annealing. Preparation. Placement. and Retrieval of TLDs for the Fermi REMP PREPARED BY NUS Corporation Company Date r

ACCEPTED BV k N

~ I w=o I

7 />%3 Date

/

.y.

.m y-.

-,.-y.-2-,,4