REACTIVITY CONTROL SYSTEM 3/4.1.3. MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE and positioned within + 12 steps (indicated position) of their group step counter demand position.

APPLICABILITY: MODES 1* and 2*.

ACTION:

l a.

With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With more than one full length rod misaligned f rom the group step counter demand position by more than j; 12 steps (indicated position), be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

c.

With more than one full length rod inoperable due to being immovable as a result of a problem identified to be in the rod i

control system and known not to affect tripability, operation may continue while troubleshooting / repair is being completed but not beyond the next required completion of SURVEILLANCE REQUIREMENT 4.1.3.1.2, provided that:

1.

All rods in the affected bank (s) are verified every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to have remained at the same position, 2.

all rods are above the rod insertion limits, and 3.

within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> at least 24 rods in the unaffected banks are demonstrated movable.

d.

With more than one full length rod inoperable due to any cause other than addressed by ACTION c. above, be in HOT STANDBY within 6 hou rs.

e.

With one full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand height by more than j;12 steps (indicated position), POWER OPERATION may continue provided that within one hour either:

  • See Special Test Exception 3.10.2 and 3.10.3 i

FARLEY - UNIT 1 & 2 8308050107 830728 PDR ADOCK 05000348 P

PDR

e REACTIVITY CONTROL SYSTEM 3/4.1.3.

HOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 1.

The rod is restored to OPERABLE status within the above alignment requirements, or 2.

The remainder of the rods in the group with the inoperable rod are aligned to within + 12 steps of the inoperable rod within one hour while maintaining the rod sequence and insertion limits of Figures 3.1-1 and 3.1-2; the THERMAL POWER level shall be restricted pursuant to Specification 3.1.3.6 during subsequent operation, or 3.

The rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied.

POWER OPERATION may then continue provided that:

a) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, i

l l

i I

i FARLEY-UNIT 1 & 2 3/1 1-14a

>