Advises That Site Verification Audit Will Be Rescheduled Upon Reevaluation of Personnel Availability & Review Priorities of Environ Qualification Branch
ML20024D436
Person / Time
Site: Fermi 
Issue date: 07/28/1983
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Tauber H
DETROIT EDISON CO.
References
NUDOCS 8308050024
Download: ML20024D436 (2)


Text

-

DIST:

M dt@ @ 50-341) l o

NRC POR L PDR 2-PRC System NSIC IUL 2 81983 LB#1 Rdg.

MRushbrook DLynch Docket No.: 50-341 DEisenhut/RPurple

-Attorney, OELD ELJordan, DIE Mr. Harry Tauber JMTaylor, OIE Engineering & Construction ACRS Detroit Edison Company VNoonan 2000 Second Avenue RLaGrange Detroit, Michigan 48226

Dear Mr. Tauber:

Subject:

Site Verification Visit for the Environmental Qualification of Electrical Equipment for Fermi-2 On July 27, 1983, we docketed the submittal of your three-volume report on the environmental qualification for the Femi-2 facility of safety-related electrical equipment in a harsh environment, dated July 19, 1983.

In your transmittal letter, you indicated that you were expecting a site verification visit by the staff from the Environmental Qualification Branch during the last part of July, or in August 1983. This expectation was based on two conversations in mid-June

'1983 between the Femi-2 Project Manager, the assigned EQB' reviewer and the EQB Section Leader representing the staff and Mr. Schuerman representing Detmit Edison. However, in both discussions, it was agreed that the tentative schedule cited above for the EQB site visit was predicated on submittal of this report on July 1,1983, or. shortly thereafter.

In view of the lateness of your submittal, the audit cannot be performed on the schedule to which we previously agreed. We wil1 ~have to rcevaluate the availability of staff personnel and the relative review priorities in the Environmental Qualification Branch before we can confirm a date for the EQB site visit.

If you have any questions on this matter, please contact the Fermi-2 Project Manager, M. D. Lynch, at 301/492-7050.

Sincerely, r

W insisiiinda W 8 3, J. YounsM8N B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing cc: See next page 9308050024 8307pg PDR ADOCK 05000341 PDR Al QNI1 2

DL:LB#1 '

DL; Q#.-d[..

f omce>

..4

=ce > N L s h/,,1,g,,,

B,J,Y l lo,od b

07..../. 27/.83 07 3

one>

NRC FORM 318 (1NO) NRCM 024o OFFICIAL RECORD COPY uscro: mi-meso

p-Mr. Harry Tauber Vice President Engineering & Construction The Detroit Edison Company 2000 Second Avenue

. Detroit, Michigan 48226 cc: Mr. Harry H. Voight, Esq.

Ronald C. Callen LeBoeuf, Lamb, Leiby & MacRae Adv.' Planning Review Section 1333 New Hampshire Avenue, N. W.

Michigan Public Service Commission Washington, D. C.

20036 6545 Mercantile Way Peter A. Marquardt, Esq..

P. O. Box 30221 Lansing, Michigan 48909-Co-Counsel The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Mr. William J. Fahrner Project Manager - Fermi 2 The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Mr. Larry E. Schuerman The Detroit Edison Company 3331 West Big Beaver Road Troy, Michiga.n 48084 John Minock, Esq.

1500 Buhl Building Detroit, Michigan 48226 Mr. Bruce Little U. S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Dr. Wayne Jens The, Detroit Edison Company 2000 Second Avenue Detroit, Michigan ~ 48226 Mr. James G. Keppler U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 4