ML20024D412

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-305/83-09 on 830606-08 & Notice of Violation
ML20024D412
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/20/1983
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Giesler C
WISCONSIN PUBLIC SERVICE CORP.
Shared Package
ML20024D413 List:
References
NUDOCS 8308050001
Download: ML20024D412 (2)


See also: IR 05000305/1983009

Text

,

.

1963.

E 'e

n

Docket No. 50-305

Wisconsin Public Service

Corporation

ATTN:

Mr. C. W. Giesler

Vice President

Nuclear Power

Post Office Box 1200

Green Bay, WI 54305

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. D. Schulz

of this office on June 6-8, 1983, of activities at Kewaunee Nuclear Power

Plant authorized by NRC Operating License No. DPR-43 and to the discussion

of our findings with Mr. D. Hintz and other members of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the re-

quirements of 2.790(b)(1) .

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosure (s), and

your response to this letter will be placed in the Public Document Room.

The responses directed by this letter (and the accompanying Notice) are

not subject to the clearance procedures of the Office of Management and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

8308050001 830720

l[I

PDR ADOCK 05000305

G

PDR

_CEOj

r

,

t

Wisconsin Public Service

2

Corporation

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original Signed by J. F. Strc'eter"

J. F. Streeter, Chief

Engineering Branch 1

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No. 50-305/83-09(DE)

cc w/encls:

D. C. Hintz, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Ness Flores, Chairperson

Wisconsin Public Service

Commission

f

I

I

RII

RIII

l

Wf

c ulz/sv

Haw

s

Slr eter

a

06/29/83'

c;