x
- W--
_r e
x g. n g.r L + :- 3; gg y
3 g39 GC h gA&C%
Docket Nos. 50-338 and 50-339 Mr. W. L. Stewart Vice President - Nuclear Operations Virginia Electric and Power Company Post Office Box 26666 Richmond, Virginia 23261
Dear Mr. Stewart:
SUBJECT:
REQdEST FOR INFORMATION REGARDING THE TRANSSHIPMENT OF SPENT FUEL FROM THE SURRY POWER STATION TO THE THE NORTH ANNA POWER STATION, UNI 1SNO.1ANDNO.2(NA-132)
By order of June 10, 1983, the Atomic Safety and Licensing Buard (ASLB) ruled that the ASLB had jurisdiction to consider the health and safety as well as envircnmental impacts regarding the subject noted above.
lhis ASt.B ruling requires additional review of your amendment r24uest dated July 13, 1982 which would allow the receipt and storage of 500 spaat feel assemblies from Surry and which would be stored in the proposed augmer.ted spent fuel pool (/mendment Request dated August 20,1982)atNA-1&P.
The NRC staff could not anticipate the June 10, 1983 ASLB ruling and, there-fore, had to initiate the imediate actions necessary to produce the require Safety Evaluation and Environfhental Impact Appraisal for the transshipment of fuel as discussed above.
It has been determined that the review and completion of the required SE and EIA will be done by the Uranium Fuel Licensing Branch, Division of Fuel Cycle and Material Safety, Office of Nuclear Material Safety andSafeguards(MMSS). Other resources of NMMS will be available to assist in this task if so required. The Division of Licensing, NRR, will coordinate the activities required to fulfill the Boards June 10, 1983 Order.
The NRC staff has completed its review of your July 13, 1982 submittal with respect to the health and safety and environmental impact regarding the trans-shipment of spent fuel from Surry to NA-1&2. The review also included your amendment request of July 13, 1982 regarding route approval.
Based on the staff review and in keeping with the Boards ruling that health and safety and the environmental impact of transshipment of fuel be addressed, the staff finds that the transportation aspect of your proposed transshipment has not been adequately addressed in your submittals.
8308040545 830719 PDR ADOCK 05000338 P
PDR o"'c' >
5==>
DATEf nac ronu aisito soisacu o24o OFFICIAL RECORD COPY
- "_ S "o ",8 3-*oo.24 A
~
Id1?iME+ mms J?hsiisghlf ifi;e.ssds;A;.gsehene;&;ggggg].
Mr. W. L. Stewart Therefore, we request that the additional infomation requested in the Enclosure to this letter be provided for our review by August 31, 1983.
Should you determine that our request date cannot be met, please advise us when your submittal can so be provided in order that we can maintain control on the : scheduling of these matters.
The infomation requested on this letter affects fewer than 10 respondents; therefore OMB clearance is not required under P.L.96-511.
Sincerely, original signed oy.
Robert Clark, Chief Operating Reactors Branch #3 Division of Licensing
Enclosure:
Request for DISTRIBUTION Additional infomation
@ cket File Local PDR cc: See next page ORB #3 Rag D.Eisenhut dittritemtar RAClark PKreutzer(3) 0 ELD NSIC E.L. Jordan J.M. Taylor (1)
ACRS (10)
LEng'a Gray tile RPage JRoberts CEhacDonald JTLong JMcGurn
\\
+ t.
sm Dh.
y..0RBA 3.:DL...
.l.Eosle.:.d('
.RAC1 ar.k.......
'""">..RKreutzer..
"">. 7as/.e.a......7 /. a /.8.3.........
.7 49. /.8.3.......
NRC FORM 318 0tO 8CINRCM O240 OFFICIAL RECORD COPY
- u.s. cno 1983-40o.24 7 m,
.m.
a k-
~. '
i Virginia Electric and Powar Company cc:
Richard M. Foster, Esq.
~
Musick, Williamson, Schwartz, leavenworth & Cope, P.C.
P. O. Box 4579 Boulder, Colorado 80306 Mrs. Margaret Dietrich Route 2, Box 568 Michael W. Maupin, Esq.
Gordonsville, Virginia 22042 Hunton, Williams, Gay and Gibson P. O. Box 1535 Mr. W. T. Lough Richmond, Virginia 23212 Virginia Corporation Commission Division of Energy Regulation Mr. Paul W. Purdom P. 0. Box 1197 Environmental Studies Institute Richmond, Virginia 23209 Drexel University 32nd and Chestnut Streets Mrs. June Allen Philadelphia, Pennsylvania 19104 North Anna Environmental Coalition 8720 Lockmoor Circle l.
Atomic Safety and Licensin9 Wichita, Kansas 67207 Appeal Board Panel U.S. Nuclear Regulatory Commission U.S. Environmental Protection Agency Washington, D. C.
20555 Region III Office f
ATTN:
Regiona.1 Radiation Representative Ellyn R. Weiss, Esq.
_ Curtis Building Sheldon, Harman, Roisman and Weiss 6th and Walnut Streets 1725 I Street, N.W. Suite 506 Philadelphia, Pennsylvania 19106 l
Washington, D. C.
20006 Regional Administrator l
Mr. E. W. Harrell Nuclear Regulatory Commission, Region II P. O. Box 402 Office of Executive Director for Operations Mineral, Virginia 23117 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. Anthony Gambardella Office of the Attorney General 11 South 12th Street - Room 308 Richmond, Virginia 23219 Resident Inspector / North Anna c/o U.S.N.R.C.
Route 2, Box 78A Mineral, Virginia 23117 Mr. J. H. Ferguson Executive Vice President - Power l
Virginia Electric and Power Company l
Post Office Box 26666 l
Richmond, Virginia 23261 l
Enclosure
.s REQUEST FOR ADDITIONAL INFORMATION VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION, UNITS N0. 1 AND N0. 2 DOCKET NOS. 50-338 AND 50-339 1.
Section 12.0, " Environmental Impact of the Proposed Action," of
" Summary of Information..." (Attachment 3 to VEPC0 request for amendment dated July 13, 1982), is silent on the environmental impact of the transportation of spent fuel from Surry to North Anna.
Add appropriate information on this topic.
2.
Discuss the applicability of Table S-4,10 CFR 51.20, to your plans for shipping fuel from Surry to North Anna.
3.
If Table S-4 does not apply, specify the average population density along each of the proposed routes, maximum irradiation level (burnup) of the spent fuel to be transshipped to North Arna, and the maximum number of shipments per year.
4.
How much, if any, of the Sufry fuel stored at North Anna will eventually be returned to the Surry fati_lity?
5.
Provide a description of the VEPCO emergency plan for responding to spent fuel transportation accidents.
n
.