ML20024D218

From kanterella
Jump to navigation Jump to search
Forwards Interim Deficiency Repts on Reportable Conditions 49 & 248 & Final Deficiency Repts on Reportable Conditions 64 & 219.Next Rept Will Be Submitted by 831019
Date released: 02/07/2020 Download: ML20024D218


Interim Deficiency Rept Re Condition 248,Anaconda Flexible Conduit.Areas Potentially Experiencing High Temp & Concurrent Steam Environ Surveyed.Internal Water Seal Will Be Installed.Work Will Be Completed Before Fuel Load
ML20024D242
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/20/1983
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
Download: ML20024D242 (2)
Final Deficiency Rept Re Condition 219,inadequate Assembly of Sway Strut/Snubber End Bushings,Per IE Circular 81-05. Original Installer of Sway Struts & Snubbers No Longer Site Contractor.Bechtel Procedures Developed
ML20024D239
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/20/1983
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
Download: ML20024D239 (4)
Final Deficiency Rept Re Condition 64,plant Electrical Separation.Insp Completed in Sept 1982.Engineering Directives Issued to Correct Deficiencies
ML20024D232
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/20/1983
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
Download: ML20024D232 (4)
Interim Deficiency Rept Re Condition 49,operation of Standby Gas Treatment Sys Damper.Circuits Will Be Rerouted for Various Dampers on Each Unit.Engineering Criteria Document Revised to Identify Sys Requiring Separation
ML20024D227
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/20/1983
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
Download: ML20024D227 (3)
Forwards Interim Deficiency Repts on Reportable Conditions 49 & 248 & Final Deficiency Repts on Reportable Conditions 64 & 219.Next Rept Will Be Submitted by 831019
ML20024D217
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/20/1983
From: Carlisle C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: MARTIN J B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
Download: ML20024D217 (1)