5 I
LONG ISLAND LIGHTING COM PANY l
(SM l w
g SHOREHAM NUCLEAR POWER STATION g
P.O. BOX 610 NORTH COUNTRY ROAD + WADING RIVER, N.Y.11792 Dkut Dbl Numkr June 30, 1983 SNRC-922 l
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Amendment No. 48 to License Application Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322
Dear Mr. Denton:
Long Island Lighting Company hereby submits its License Application, consisting of Revision 30 to the Final Safety Analysis Report.
The following significant items are included in this revision:
1)
Change to correct discrepancies identified by the Shoreham Plant Configuration Review Program for the following systems:
B21 Nuclear Boiler C51 Neutron Monitoring C61 Reactor Remote Shutdown D21 Area Radiation Monitoring Gil Radwast e G33 Reactor Water Cleanup N11 Main Steam N21 Condensate and Feedwater Pll Condensate Transfer and Storage P21 Demineralized and Makeup Water P33 Sample P42 Reactor Building Closed Loop Cooling Water P50 Compressed Air R43 Emergency Diesel Generators T41 Beactor Building Ventilation T46 Reactor Building Standby Ventilation T47 Primary Containment Cooling X41 Miscellaneous HVAC X61 Control Room HVAC 2)
Section 9.5 was revised to address the automatic closure of
\\
rollup doors with respect to fire protection.
TI (M ggI 8307200002 830630 A\\
FC-89 35.2 PDR ADOCK 05000322 K
PDR i'
- SNRC-922 June 30, 1983 Page 2 3)
Reactor vessel low pressure and high drywell pressure setpoints per G.E.
drawing 913E761 (Section 6.3 and T.7.3.1-1 page 1) were revised.
4)
Figure 9.2.3-A was revised,
" Demineralized Water Makeup System".
5)
Table 6.2.3-2 was revised in response to NRC review of Shoreham's compliance with RG,1.52 as described in Section 6.2 of the FSAR.
6)
Section 3.6 and Appendix 3C were revised due to modifications to the piping failure analyses, primarily to reflect the re-vised pipe rupture locations resulting from the updated stress evaluations.
The stress evaluations now incorporate the Mark II hydrodynamic loads and the as-built piping configurations.
7)
Section 11.2.2.4 was revised to allow completion of the regenerant evaporator.
8)
Sections II.K.l.22 and II.K.3.22 were revised to reflect auto-matic RCIC suction and automatic transfer.
9)
Table 6.2.4-1 sheet 8 of 10 was revised to show control systems division utilized a spare mechanical penetration.
10)
Section 13.1.2.4 was revised to reflect correct Shift Crew Complement 11)
Section 3.1.2.1 was revised to conform to our commitment in SNRC-854 dealing with nonsafety-related structures, systems and components.
12)
Figures 5.5-7-3A&B and 7.3.1-10A&B were corrected to show proper drawing reference location ~ markers.
13)
Section 1.1 was revised to describe the level of detail provided in the FSAR.
14). Figures 8.3.2-9A,B and C were revised due to loading changes on the 125V batteries.
15)
Section 6.2.4.3.2 was revised to reflect as-built conditions of the plant.
16)
Section 9.5 was revised to describe 'the portions of CO2 dedicated 'for fire protection and for purging the turbine generator.
w
SNRC-922 June 30, 1983 Page 3 17). Appendix 2J and responses to NRC requests 324.9 and 324.10 were revised to incorporate information transmitted in SNRC-787.
18)
Table 3.2.1-1 and responses to NRC request 260.1, pages 260.le through 1 were revised to provide clarification of -table entries.
(
' 19)' Section 3.12 was. revised to incorporate information.previously
-letter submitted concerning electrical separation criteria.
20)
General editorial-changes from FSAR revision 29 21)
Section 11.3 was revised to document a potential unmonitored release point.
22)
Section 7.2 was revised to show the analog trip system, which replaces certain switches with analog transmitters (FSAR page 7.2-4).
23)
Responses to NRC requests 223.88, 223.99 and 223.100 on ESF Resets were updated per letter SNRC-901.
-The above items reflect FSAR closure of concerns identified in the course 'of NRC staff and LILCO review of the Shoreham ' license application and I&T. on-site engineering review.
Three signed originals of Amendment 48 and an additional sixty-(60) copies are being transmitted herewith.
Instructions for making the necessary page changes are enclosed for your convenience.
Very truly yours,
..L.
Smith Manager, Special Projects 3
Shoreham Nuclear _ Power' Station,
..GJG/ law S3-
- Attachment Enclosures'.
t l
cc:'
J. Higgins All Parties L'isted in; Attachment 1 J
t L
I f
4 a
t.
AFFIDAVIT STATE OF NEW YORK) ss:
Shoreham COUNTY OF~SUFFOLK)
JEFFREY L.. SMITH, being duly' sworn, stat.c3 that he is Manager, Special Projects, of the Shoreham Project within Long Island Lighting Company, that he is authoirzed on.the part of said.
Company to sign and file with the U.S. Nuclear Regulatory 4
Commission the foregoing Amendment No. 48 to License Application, Shoreham Nuclear Power Station, Unit 1, Docket No. 50-322; that
--Amendment No. 48 was prepared under his supervision and direction; and that the statements contained therein are true'and correct to i
the-best of his knowledge, information and belief.
~
Jef Smi'th Sworn to before.me this
~
a9 day of June, 1983 x
NANCY L LHMITT NOTARY P'JBUC. State of Nen York No. 52-8326330, Suffo;k Ccunty Term Expires March 30,19$
l
ATTACHMENT 1 Lawrence Brer$ner, Ezq.
Herbert H. Brown, Esq.
Administrative Judge Lawrence Coe Lanpher, Esq.
Atomic Safety and Licensing Karla J. Letschc, Esq.
Board Panel Kirkpatrick, Lockhart, Hill U.S. Nuclear' Regulatory Commission
~ Christopher & Phillips Washington, D.C.
20555 8th-Ploor 1900 M Street, N.W.
Dr. Peter A.: Morris Washington, D.C.
20036-Administrative Judge Atomic Safety and Licensing Mr. Marc W. Goldsmith Board Panel.
Energy Research Group U.S. Nuclear' Regulatory Commission 4001 Totten Pond Road Washington, D.C.
20555 Waltham, Massachusetts 02154 MHB Technical Associates Dr.' James H. Carpenter
. Administrative Judge l'123 Hamilton.;svenue Atomic Safety and Licensing Suite K San Jose, California 95125 Board Panel U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Stephen'B. Latham, Esq.
Twomey, Latham & Shea Daniel F. Brown, Esq 33 West Second Street P.O. Box 398 Attorney Atomic Safety and Licensing Riverhead, New York 11901 Board Panel U.S. Nuclear Regulatory Commission Ralph Shapiro, Esq.
Washington, D.C.
20535 Cammer and Shapiro, P.C.
9 East 40th Street Bernard M.
Bordenick, Esq.
New York, New York 10016 David A.
Repka, Esq.
U.S. Nuclear Regulatory Commission Matthew J.
Kelly, Esq.
Washington, D.C.
20555 State of New York Department of'Public Service-
-James Dougherty Three Empire State Plaza 3045 Porter Street Albany, New York 12223 Washington, D.C.
20008 e
6
. k to 4