ML20024C662
| ML20024C662 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/15/1977 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | |
| Shared Package | |
| ML20024C648 | List: |
| References | |
| GPU-2052, IEB-77-05A-02, IEB-77-5A-2, NUDOCS 8307120935 | |
| Download: ML20024C662 (1) | |
Text
l.
IE Bulletin 77-05A November 15, 1977 q
LISTING 0F IE BULLETINS th ISSUED IN 1977 g
q Bulletin Subject.
Date Issued Issued To jp q&'
No.
Y All Holders of Op-(0L) 77-05 Electrical Connector 11/8/77 erating Licenses Assemblies or Construction Permits (CP) 77-04 Calculational Error 11/4/77 All PWR Power Affecting the Design Reactor Facilities Performance of a System with an Operating for' Controlling pH of License (OL) or Containment Sump Water Construction Permit (CP) i Following a LOCA, 77-03 On-Line Testing of 9/12/77 All W Power the W Solid State Reactor Facilities Protection System with,an Operating License (OL) or Construction Permit (CP) 77-02 Potential Failure 9/12/77 All Holders of i
Mechanism in Certain Operating Licens.es i
W AR Relays with (OL)orConstruc-fatch Attachments tion Permits (CP) i 77-01 Pneumatic Time 4/29/77 All Holders of
~ -
Delay Relay Set Point Operating Licenses Drift (OL) or Construc-tion Permits (CP) 1[
~;
Jj
- o
}
-t e
8307120935 771108 PDR ADDCK 05000289 0
E
.