ML20024C338
| ML20024C338 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/29/1983 |
| From: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Carlisle C WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20024C339 | List: |
| References | |
| NUDOCS 8307120532 | |
| Download: ML20024C338 (2) | |
See also: IR 05000397/1983021
Text
r
a me%
9
UNITF3 STATES
[
' p,
NUCLEAR REGULATORY COMMISSION
'
L
s
REGION V
C
g
1450 MARIA L ANU,nUITE 210
%,
,d
WALNUT CREEK, CALIFORNI A 94596
JUN 2919g3
Docket No. 50-397
Washingto'n Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention:
Mr. C. S. Carlisle
Program Director
Gentlemen:
Subject: NRC Inspection of WNP-2 (Preoperational Test Phase)
This refers to the routine inspection conducted by Mr. R. A. Feil of this
office during May 1983 of activities authorized by NRC Construction Permit
No. CPPR-93, and to the discussion of our findings held by the inspector with
Mr. G. K. Afflerbach and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
.No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter. Such application must be consistent with the
requirements of 2.790(b)(1).
9307120532 830629
i
{DRADOCK05
{ C[
."
!
.. '.
'
1
~
, - -
.,
.
. . -
,
-
- , ,
-
jun 291983
Washin'gton Public Power Supply System-
-2-
-
,
-
t
'
>
.
>
,
,
w,
+
. .
s
<
>
,
,
'Should you have any iuestions co'ncerning this inspection, we will be glad to
l
discuss them~with;you.-
i
, )
'
Sincerely,
l
'
"
'
'
,
.
D. M. Sternberg, Chief
.
Reactor Projects Branch No.1
Enclosure:
'
Inspection Report
No. 50-397/83-21
l
cc w/o enclosure:
R. B. Glasscock
J. D. Martin
bec: RSB/ Document Control Desk (RIDS)
Distributed by RV:
JBM
State of Washington
Resident Inspector
,
'
'
RV
.
R.Fe :dh
R
odds
.- ~D.Sternberg
" , g /83
6/
/83.. '
6/
83'
6
'
,
-
,
, c
w.
.
.
.
~
-*
,
,p
,:
7, " s ;
'
1-
- D 1.>
^R.-
~s;z.
-
,;o.
.;
y'
,f
.
- }
)'
~
u
~
.
e
,., y '
-
- ~ ,3
,
'
'~
'
,
%
A * 4
x
,
n;, s
'y.
,
,[
%+,
' ' _ '
s
3
',
L'
'- i
,
,
~
~k
n
,