ML20024C178

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept DER 82-63 Re Design Calculation Error in Refueling Water Tank Seismic Response.Initially Reported on 821026.Deficiency Not Reportable Per 10CFR50.55(e). Bechtel Independent Analysis of Calculations Encl
Date released: 02/07/2020 Download: ML20024C178


Rev 1 to Engineering Evaluation for Design of Condensate Water Storage Tank & Refueling Water Tank,Palo Verde Nuclear Generating Station, for Deficiency Evaluation Repts 82-56 & 82-63
ML20024C184
Person / Time
Site: Palo Verde 
Issue date: 05/31/1983
From: Bergquist S, Hughes W, Limaye G
BECHTEL GROUP, INC.
To:
References
Download: ML20024C184 (28)
Final Deficiency Rept DER 82-63 Re Design Calculation Error in Refueling Water Tank Seismic Response.Initially Reported on 821026.Deficiency Not Reportable Per 10CFR50.55(e). Bechtel Independent Analysis of Calculations Encl
ML20024C177
Person / Time
Site: Palo Verde 
Issue date: 06/27/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: STERNBER D M, STERNBERG D M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
Download: ML20024C177 (32)