0 9 1983.
Docket No.s 99900507/83-01
[
i
.Sargent and Lundy Enginee.rs-i.
' ATTN: Mr. R. W. Patterson a
~ Senior Partner i
55 East Monroe Street Chicago, Illinois 60603 Gentlemen:
This refers.to the inspection conducted by Mr. D. D. Chamberlain of this office on March 28-April 1,.1983, of.your facility at Chicago, Illinois, and to the.
j-discussions of our findings with Mr. H. S. Taylor and members of your staff at the, conclusion of the inspection.
Included in.this inspection were:
(1) NRC Region III request _for a review.
of the seismic design of the main' steam line from the outboard containment isolation valve to the turbine stop valves (Zimmer); (2) Review of Sargent Land Lundy (S&L) methods for consideration of. local pipe stresses induced by l
.pipeclampattachments;(3)10~CFRPart50.55(e) Report (Zimmer)statingthat
'S&L did not adequately translate applicable electrical separation criteria into
.theinstallationspecificationsand/ordrawings;and(4)10CFRPart50.55(e)
Report (Clinton) regarding improperly tightened jam nuts on structural steel
. expansion connections.
Areas examined during this-inspection and our findings are discussed in l'
the enclosed report.- Within these areas, the inspection consisted of an examination of procedures _and representative records, interviews with.
personnel, and observations by the inspector.
4
'Within the scope of thisLinspection, we found no instance where you failed to
. meet the commitments of your Topical Report No. SL-TR-1A or NRC requirements.-
i In'accordance-with 10 CFR 2.790 of.the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public
-Document Room.
If this report contains any information that you believe to be exempt'from disclosure under 10 CFR r 5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter k
SC:RS BC:VPB D:V DDChamberlain/rc fJHale.
pPotapovs.I RLBa rt 5/26/83 y7/83 y y/83 5/(/83 0
p
/l()[
B30)120279 830609
(
PDR GA999 EECSALE 99900507 PDR
- a. -
Sargent and Lundy Engineers of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify with Section 2.790(y so that a new due date may be established.b)(1), any such applica this office promptl Consistent affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be-withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-porated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, gg.i stened M U. PO W W Uldis Potapovs, Chief Vendor Program Branch
Enclosures:
1.
Appendix A - Inspection Report No. 99900507/83-01 2.
Appendix B - Inspection Data Sheets (12 pages) bcc:
JTCollins, RIV RLBangart, RIV JEGagliardo, RIV MIS Section (J. Perry)
VPB Branch Chief VPB Section Chiefs VPB Inspector DMB-IE:09 l
l t