ML20024C113
| ML20024C113 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/16/1983 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 8307120272 | |
| Download: ML20024C113 (1) | |
Text
.
1 TEXAS UTILITIES GENERATING COMInNY 2ru nt tilty t N 113w Ett g3 gg j,gs,TEggs733334wng:
R. J. GARY
'" Z'!:nTl ""'!ll' Junc=In 10A1 M M O M M-(
7 s
i JUN 2 01983 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Conunission, Region IV 3
Division of Inspection and Enforcement 611 Plaza Drive, Suite 1000 Docket No. 50-443 Arlington, TX 76011 50-446
Dear Mr. Collins:
'In preparation for the operation of omanche Peak Steam Electric Station (CPSES) Unit 1, we have realigned responsibilitics within TUGCO/TUSI for handling matters related to Region IV activitics. Therefore, I am requesting that the following addressec be included to roccive a copy with enclosures of all correspondence originating from Region IV and I&E Headquarters:
Texas Utilitics Generating Company I
B. R. Clements, Vice President, Nuclear 2001 Bryan Tower, Suite 1735 Dallas, Texas 75201 Thank you for your attention to this matter, l
Sincercly, i
l RJG:cp i
c:
Mr. G. L. Madsen l
>4\\ 4 8307120272 830616 PDR ADOCK 05000445 l
H PDR l
t