ML20024C098

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-267/83-06 on 830228-0304.No Noncompliance Noted
ML20024C098
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/23/1983
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20024C099 List:
References
NUDOCS 8307120255
Download: ML20024C098 (2)


See also: IR 05000267/1983006

Text

,

.,

pm8

.

.

AY 231963

Docket: 50-267/85-06

Public Service Company of Colorado

ATTN:

0. R. Lee, Vice President

Electric Production

P. O. Box 840

Denver, CO 80201

Gentlemen:

This refers to the routine radioactive waste systems inspection conducted by

Mr. W. L. Holley of this office during the period February 28-March 4,1983, of

the activities authorized by NRC License DPR-34 for Fort St. Vrain Nuclear

Station, and to the discussion of our findings held with Mr. D. W. Warembourg

and other members of your staff.

Principal areas examined during the radwaste program inspection included:

(1) radiochemistry and health physics organizations; (2) radioactive effluent

releases, liquid and gaseous; (3) records and reports of radioactive effluents;

(4) effluent control instrumentation; (5) procedures for controlling the release

of effluents; (6) testing of air cleaning systems; (7) reactor coolant quality;

(8) audits of radwaste activities; and (9) reportable occurrences. Within these

areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the

inspector. The inspection findings are documented in the enclosed inspection

report.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter, and submit written

application to withhold information contained therein within 30 days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be pleased to

discuss them with you.

Sincerely,

eoriginal S18ned tWs

B307120255 830523

IL ;:. NIADSW -

PDR ADOCK 05000267

Glen L. Madsen, Chief

C

PDR

React r Project Branch 1

l A

4

RPBlD.

DRRP&

DV

FRPS}/1Y

FRPSf

TPBj

RPSA

[GLMddsenp/(1/83

0/fngart

EGagliardo

}!LHolley/j kh

BMurray

GD

wn

TFWes erman

J////83

j /[/83

/

83j/jt/83

//7/83 -

/83

M

IM

'

,

.

MAY 2 319$3

Public Service Company of Colorado

2

Enclosure:

Appendix - NRC Inspection Report: 50-267/83-06

cc:

D. W. Warembourg, Nuclear Production

Manager -

Fort St. Vrain Nuclear Station

P.O. Box 368

Platteville, CO 80651

J. Gahm, Quality Assurance Manager

(same address)

bec distrib. by RIV:

RPB1

Resident Inspector

RPB2

SectionChief(RPS-A)

TPB

J. Collins, RA

R. Bangart

MIS SYSTEM

RIV File

COLORADO STATE DEPT. HEALTH