1
JUN 341983
Docket No. 50-271
Vermont Yankee Nuclear Power Corporation
ATTY:
Mr. Warren P. Murphy
Vice President and Manager
of Operations
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
Gentlemen:
Subject:
Inspection 50-271/83-16
This refers to the routine inspection conducted by Dr. R. K. Struckmeyer of
this office on June 6-10, 1983 at the Vermont Yankee Nuclear Power Station,
Vernon, Vermont of activities authorized by NRC License No. DPR-28 and to the
discussions of our findings held by Dr. Struckmeyer with Mr. J. Pelletier and
others of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the require-
ments of 10 CFR 2.790(b)(1). The telephone notification of your intent to
request withholding, or any request for an extension of the 10-day period
which you believe necessary, should be made to the Supervisor, Files, Mail
and Records, USNRC Region I, at (215) 337-5223.
No reply to this letter is required.
Your cooperation with us in this matter
is appreciated.
Sincerely,
CEtIGINAL SIGNED BY
. h,
1 c' Thomas T. Martin, Director
. T Division of Engineering and
d
Technical Program,
Enclosure: NRC Region I. Inspection Report No. 50-271/83-16
0FFICIAL RECORD COPY
\\(? o\\
8307110498 830624
PDR ADOCK 05000271
v
Q
j j
'
3
,s
Vermont Yankee Nuclear Power Corporation
2
cc w/ enc 1:
Mr. J. B. Sinclair, Licensing Engineer
Mr. W. F. Conway, President and Chief Executive Officer
Mr. J. P. Pelletier, Plant Manager
Mr. L. H. Heider, Vice President
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Hampshire
State of Vermont
bec w/ encl:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
DPRP Section Chief
.
M
e
e
e
11/&
Struckmeyer/wb
f ang
T. Martin
OFFICIA
R ORD CO
-