ML20024B799

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/83-07 on 830502-30.No Noncompliance Noted
ML20024B799
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/23/1983
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kanga B
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20024B800 List:
References
NUDOCS 8307110392
Download: ML20024B799 (2)


See also: IR 05000320/1983007

Text

.

a.

.

<

JUN 2 31993

Docket No. 50-320

GPU Nuclear Corporation

ATTN: Mr. B. K. Kanga

Director of THI-2

P.O. Box 480

Middletown, Pennsylvania 17057

Gentlemen:

Subject:

Inspection 50-320/83-07

This refers to the routine safety inspection conducted by Mr. L.H. Thonus of

this office on May 2 - 30, 1983, of activities authorized by HRC License

DPR-73 and to the discussions of our findings held by Mr. Thonus with

Messrs. J. Larson and J. Hildebrand and other members of your staff at the

conclusion of the inspection and to a subsequent telephone discussion between

Mr. J. Wiebe of this office and Mr. S. Chaplin of your staff on June 7,1983.

_

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter and submit written

application to withhold information contained therein within 30 days of the

date of this letter. Such application must be consistent with the

requirements of 2.790(b)(1). The telephone notification of your intent to

request withholding, or any request for an extension of the 10 day period

which you believe necessary, should be made to the Supervisor, Files, Hail and

Records, USNRC Region I, at (215) 337-5223.

I'

IEol

0FFICIAL RECORD COPY

8307110392 830623

PDR ADOCK 05000320

0

PDR

---

- _ .

.

.,

a

GPU Nuclear Corporation

2

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

.

,

g

f. /O*"'t 6

plyrisA Sf

Richard W. Starostecki, Director

Division of Project and Resident

Programs

Enclosure:

NRC Region I Inspection Report 50-320/83-07

cc w/ encl:

J. J. Barton, Deputy Director, TMI-2

J. J. Chawastyk, Acting Site Operations Director

J. E. Larson, Licensing and Nuclear Safety Director

J. J. Bryne, Manager, THI-2 Licensing

R. L. Freemerman, Manager, Recovery Programs

E. G. Wallace, Manager, PWR Licensing

J. B. Liberman, Esquire

G. F. Trowbridge, Esquire

PublicDocumentRoom(PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Consnonwealth of Pennsylvania

Ms. Mary V. Southard, Co-Chairman, Citizens for a Safe Environment

(WithoutReport)

bcc w/ encl:

Region I Docket Room (w/ concurrence)

L. Barrett, Deputy Program Director, TMI Program Office

J. Goldberg, OELD:HQ

Chief, Operational Support Section (wo/ encl)

Ms. Mary V. Southard, Co-Chairman, Citizens for a Safe Environment

ed.mi2eS

, yPS

E,12PS

TMI P,0,

DPR,P#,2,, ,

DPRP, .

,t ,

.J f,e,fe , , , , , ,

-d*j.'PMLsMes..

,,

,,,,, ,,,

[, ,, ,, ,, ,, ,

, L ,,rr

R,Ke,i,m,1,g , , , , , , ..RS,t ,o

e,c k,1, .

,,,,,,

,,,,

,

,,,,,,,,,,,,, ,

AF

,

,,,,,,

,

,,,,,

,, ,,,,,,,,,,,,,

6 /" 6

. ./ 4. /8. . . . . . . . .6. .l.9/83. . . . . . .

6n.?/.83.....

..U.983.....p.us.3......... 6/n/.8.3. . . . . . .

............. .

wxe eonu sis osso) NRCM O240

OFFICIAL RECORD COPY