JUN 241983
Docket No. 50-247
Consolidated Edison Company of
New York, Inc.
ATTN: Mr. John D. O'Toole
Vice President - Nuclear
Engineering and Quality Assurance
4 Irving Place
Gentlemen:
Subject:
Inspection No. 50-247/83-13
This refers to the routine safety inspection conducted by Mr. J. White of this
office on May 17-20, 1983 of activities authorized by NRC License No. DPR-26,
to the discussions of our findings held by Mr. White with Mr. R. Gauny and Mr.
M. Blatte at the conclusion of the inspection, and to the subsequent telephone
conversation between Mr. White and Mr. Blatt on June 17, 1983.
Areas examined during this inspection are described in the NRC Region I Inspec-
"
tion Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed. However, we
are concerned about the potential for uncontrolled and unmonitored radioactive
gaseous effluent release from the Primary Auxiliary Building (PAB) which could
result from failure to maintain this building at a negative pressure, relative
to the outside atmosphere. This item is discussed in section 3.0 of the
attached Inspection Report. Your corrective actions as documented in the
report appeared to adequately address the immediate problem, an unmonitored
gaseous effluent release path from the PAB through the Maintenance and Outage
Building (MOB) to the environment. However, at the time of the inspection you
did not address the general problem of controlling the air balance between the
PAB and the environment. Please submit to this office, within 30 days of the
date of this letter, a written statement or explanation in reply to this item
which includes the corrective steps that will be taken to insure that the air
balance between the PAB and the environment is properly controlled in the
future.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the
requirements of 2.790(b)(1). The telephone notification of your intent to
request withholding, or any request for an extension of the 10-day period
which you believe necessary, should be made to the Supervisor, Files, Mail and
Records, USNRC Region I, at (215) 337-5223.
OFFICIAL RECORD COPY
8307110386 830624
do
PDR ADOCK 05000247
f(e
G
Q
.
.,
.
<.
.
Consolidated Edison Company of
2
I
New York, Inc.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
ORIGINAL SIGNED BY
i'
YThomas T. Martin, Director
iDivision of Engineering and
Technical Programs
Enclosure: NRC Reguion I Inspection Report 50-247/83-13
cc w/ encl:
C. W. Jackson, Vice President, Nuclear Power
M. Blatt, Acting Director, Regulatory Affairs
W. D. Hamlin, Assistant to Resident Manager (PASNY)
F. Hatra, Resident Construction Manager
R. L. Spring, Nuclear Licensing Engineer
Director, Power Division
Thomas J. Farrelly, Esquire
K. Burke, General Manager, Administrative Services
Brent L. Brandenburg, Assistant General Counsel
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York
bec w/ enc 1:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
DPRP Section Chief
- 4D
hl
i
iTP
RI.
.
4/jpf
aky
pe 'l
Ma in
6
L/83
/)
Qc y ,
l
1
0 FIC
ECORD COPY
l
l
h