TiiE P.'.SCOCK & illLCOX COMPAllY I
PO' DER GEllERATION GROUP 1
i E. R. Kane. Licensing Fro:s E. W. Swanson. Plant Integration
'88 " 8 8 Cust.
File No.
or Ref.
All Operatint Plants Subj.
Date l
Pressurizer Relief Valve April 5, 1979 j,,......._......
Please review the following proposed operating instruction; if you concur please have this procedure implemented for all operating reactors.
-Upon receipt of an ESFAS signal or a low reactor coolant systc:a pressure of 1600 psig. the operator should iz:nediately isolate the block isolation valve upstream of the pressurizer pilot operated relief valve. -
At a later date all operating rencoors should caka a syste:a design modifica-tion to isolate the block valve automatically using either a low reactor coolant system pressure signal or an ESFAS signal All backlog ecatracts abould also make a design change to auto =atically '
.O isolate the bioct va1ve ust=> ESrRS sinnais. secause the ne = >1a =s cust comply with Reg. Cuide 1.75 IE to non-1E isolation, the block valve should recieve 2 buffered ISTAS outputs in a fashion similar to the turbine stop valve signals.
D. C. Newton is requested to issue a CI/A to imple=ent this change.
s 1
f 6
on -
ces D. E. Lee D. C. Nevton R. E. Ham
- 1. E. Wascher
- 5. A. Karrasch
~ ~,
l N. S. Elliott
~
Ted Book l
J. F. Walters
~,.
I C. C. Shieck C. D. Russell FEW." LaBelle*
4 e
O 99g
% g/o M5.,.
P J.R. Danyo 8307090104 790405 DR ADOCK 05000289 HCL