ML20024B543

From kanterella
Jump to navigation Jump to search
Requests Review of Proposed Operating Instruction Re Pressurizer Relief Valve.Procedure Should Be Implemented for All Operating Reactors If Approved
ML20024B543
Person / Time
Site: Crane  Constellation icon.png
Issue date: 04/05/1979
From: Swanson E
BABCOCK & WILCOX CO.
To: Kane E
BABCOCK & WILCOX CO.
References
TASK-01, TASK-02, TASK-06, TASK-1, TASK-2, TASK-6, TASK-GB GPU-0296, GPU-296, NUDOCS 8307090104
Download: ML20024B543 (1)


Text

.

TiiE P.'.SCOCK & illLCOX COMPAllY I

PO' DER GEllERATION GROUP 1

i E. R. Kane. Licensing Fro:s E. W. Swanson. Plant Integration

'88 " 8 8 Cust.

File No.

or Ref.

All Operatint Plants Subj.

Date l

Pressurizer Relief Valve April 5, 1979 j,,......._......

Please review the following proposed operating instruction; if you concur please have this procedure implemented for all operating reactors.

-Upon receipt of an ESFAS signal or a low reactor coolant systc:a pressure of 1600 psig. the operator should iz:nediately isolate the block isolation valve upstream of the pressurizer pilot operated relief valve. -

At a later date all operating rencoors should caka a syste:a design modifica-tion to isolate the block valve automatically using either a low reactor coolant system pressure signal or an ESFAS signal All backlog ecatracts abould also make a design change to auto =atically '

.O isolate the bioct va1ve ust=> ESrRS sinnais. secause the ne = >1a =s cust comply with Reg. Cuide 1.75 IE to non-1E isolation, the block valve should recieve 2 buffered ISTAS outputs in a fashion similar to the turbine stop valve signals.

D. C. Newton is requested to issue a CI/A to imple=ent this change.

s 1

f 6

on -

ces D. E. Lee D. C. Nevton R. E. Ham

1. E. Wascher
5. A. Karrasch

~ ~,

l N. S. Elliott

~

Ted Book l

J. F. Walters

~,.

I C. C. Shieck C. D. Russell FEW." LaBelle*

4 e

O 99g

% g/o M5.,.

P J.R. Danyo 8307090104 790405 DR ADOCK 05000289 HCL