ML20024A899

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-245/83-08 & 50-336/83-10 on 830508-0604.No Noncompliance Noted
ML20024A899
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/14/1983
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20024A900 List:
References
NUDOCS 8307010155
Download: ML20024A899 (2)


See also: IR 05000245/1983008

Text

'

s

.

JUN 141983

Docket No. 50-245

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection Nos. 50-245/83-08 and 50-336/83-10

This refers to the routine safety inspection conducted by Messrs. J. T. Shediosky

and D. R. Lipinski of this office on May 8 - June 4,1983 at the Millstone

Nuclear Staton, Waterford, Connecticut of activities authorized by NRC License

Nos. DPR-21 and DPR-65 and to the discussions of our findings held by J. T.

Shediosky with Mr. E. Mroczka and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, measurements made by the inspector, and

observations by the inspector.

5

Our inspector also verified the steps you have taken to correct the' violation '

brought to your attention in the enclosure to our letter dated May 1, 1981. We

have no further questions regarding your actions at this time.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

s

the date of this letter.

Such application must be consistent with the require-

ments of 10 CFR 2.790(b)(1).

The telephone notification of your intent to

request withholding, or any request for an extension of the 10-day period

which you believe necessary, should be made to the Supervisor, Files, Mail

and Records, USNRC Region I, at (215) 337-5223.

>

s307010155 830614

k

'

PDR ADOCK 05000245

O

PDR

14

0FFICIAL RECORD COPY

-

.

..

-

-

- - . .

,

.

JUII 1 4 I903

Northeast Nuclear Energy Company

2

No reply to this letter is required. Your ooperation with us in this matter

is appreciated.

Sincerely, original Signed Bya

,

CW

~

g

R Richard W.

taro tecki, Director

g

Division of Project and Resident

Programs

'

Enclosure: Combined NRC Regio I Inspection Report Numbers 50-245/83-08

and 50-336/83-10

cc w/ encl:

J. F. Opeka, Vice President, Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of-Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

.NRC Resident Inspector

State of Connecticut

'

bec w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

DPRP Section Chief

l

M

(%P

7

RI:DPRP

R :DPRP

RI:DPRP

p/9/83

hediosky/nm

Elsasser

Greenman

(,popy

6

0FFICIAL RECORD COPY

.

-

. _ . .

..