ML20024A899
| ML20024A899 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/14/1983 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20024A900 | List: |
| References | |
| NUDOCS 8307010155 | |
| Download: ML20024A899 (2) | |
See also: IR 05000245/1983008
Text
'
s
.
JUN 141983
Docket No. 50-245
Northeast Nuclear Energy Company
ATTN:
Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection Nos. 50-245/83-08 and 50-336/83-10
This refers to the routine safety inspection conducted by Messrs. J. T. Shediosky
and D. R. Lipinski of this office on May 8 - June 4,1983 at the Millstone
Nuclear Staton, Waterford, Connecticut of activities authorized by NRC License
Nos. DPR-21 and DPR-65 and to the discussions of our findings held by J. T.
Shediosky with Mr. E. Mroczka and other members of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspec-
tion Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, measurements made by the inspector, and
observations by the inspector.
5
Our inspector also verified the steps you have taken to correct the' violation '
brought to your attention in the enclosure to our letter dated May 1, 1981. We
have no further questions regarding your actions at this time.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
s
the date of this letter.
Such application must be consistent with the require-
ments of 10 CFR 2.790(b)(1).
The telephone notification of your intent to
request withholding, or any request for an extension of the 10-day period
which you believe necessary, should be made to the Supervisor, Files, Mail
and Records, USNRC Region I, at (215) 337-5223.
>
s307010155 830614
k
'
PDR ADOCK 05000245
O
14
0FFICIAL RECORD COPY
-
.
..
-
-
- - . .
,
.
JUII 1 4 I903
Northeast Nuclear Energy Company
2
No reply to this letter is required. Your ooperation with us in this matter
is appreciated.
Sincerely, original Signed Bya
,
~
g
R Richard W.
taro tecki, Director
g
Division of Project and Resident
Programs
'
Enclosure: Combined NRC Regio I Inspection Report Numbers 50-245/83-08
and 50-336/83-10
cc w/ encl:
J. F. Opeka, Vice President, Nuclear Operations
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of-Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
.NRC Resident Inspector
State of Connecticut
'
bec w/ encl:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
DPRP Section Chief
l
M
(%P
7
RI:DPRP
R :DPRP
RI:DPRP
p/9/83
hediosky/nm
Elsasser
Greenman
(,popy
6
0FFICIAL RECORD COPY
.
-
. _ . .
..