1
.hM8
~
.
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. Richard P. Crouse
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
T. A. Peebles and W. G. Rogers of this office on February 1 through April 29,
1983 of activities at Davis-Besse Nuclear Power Station authorized by NRC
Operating License No. NPF-3 and to the discussion of our findings with
Mr. T. Murray at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
With regard to Item 2 of the Notice of Violation, we would like to point out
that prior to returning equipment to normal operating status, the causes of
malfunctions should be promptly determined, evaluated and documented.
Failed
equipment should be analyzed to determine whether a replacement component of
the same type can be expected to perform its function reliably. Paragraph 6
describes an event where adequate and timely steps were not taken to analyze
a component failure. Therefore, in addition to your response to this item of
noncompliance, please provide a response to the questions contained in
Paragraph 6.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within ten (10) days from the date of this latter of your intention to file a
request for withholding; and (b) submit within twenty-five (25) days from the
8306220037 830907
PDR ADOCK 05000346
JQ /j
{
G
g
.
<
g.
.
w
.
.
2
Toledo Edison Company
June 7, 1983
date of this letter a written application to this. office to withhold such in-
formation. If yo'ur receipt of this letter'has been delayed such that less than
seven (7) days are available for your review, please notify this office promptly
so that a.new due date may beJestablished. Consistent with Section 2.790(b)(1),
any such application must be' accompanied by an affidavit executed by the owner
-of the information which identifies -the document or part sought to be withheld,
.and which~contains a full statement of the reasons which are the bases for the
~
. claim that the information'should be withheld from public disclosure.- This
section further requires the statement to address with specificity the con-
siderations-listed in 10-CFR 2.790(b)(4). The information sought to be withheld
shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted
above,.a copy of this letter, the enclosures, and your response to this letter
will be placed in the Public Document Room.
The. responses directed by this letter (and the accompanying Notice) are
'not subject to the clearance procedures of the Office of Management and
Budget as . required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
C al* i #U'
4 .;g h,d Oi g ". 17
C. E. Norelius, Director
Division of Project and
Resident Programs
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No. 50-346/83-05(DPRP)
cc w/enels:
T. D. Murray, Station
~ Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
James W. Harris, State of Ohio
Robert H. Quillin, Ohio
Department of Health
RII
RIII
RIII
f
m
J
tw/sv
-
as
.06/03/83[ J
4
6
O
\\$
.