Forwards IE Insp Rept 50-346/83-05 on 830201-0429 & Notice of Violation.Causes of Malfunctions Should Be Determined, Evaluated & Documented Prior to Returning Equipment to Normal Operating Status
ML20024A667
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/07/1983
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20024A669 List:
References
NUDOCS 8306220037
Download: ML20024A667 (2)


See also: IR 05000346/1983005

Text

1

.hM8

~

.

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

T. A. Peebles and W. G. Rogers of this office on February 1 through April 29,

1983 of activities at Davis-Besse Nuclear Power Station authorized by NRC

Operating License No. NPF-3 and to the discussion of our findings with

Mr. T. Murray at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

With regard to Item 2 of the Notice of Violation, we would like to point out

that prior to returning equipment to normal operating status, the causes of

malfunctions should be promptly determined, evaluated and documented.

Failed

equipment should be analyzed to determine whether a replacement component of

the same type can be expected to perform its function reliably. Paragraph 6

describes an event where adequate and timely steps were not taken to analyze

a component failure. Therefore, in addition to your response to this item of

noncompliance, please provide a response to the questions contained in

Paragraph 6.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this latter of your intention to file a

request for withholding; and (b) submit within twenty-five (25) days from the

8306220037 830907

PDR ADOCK 05000346

JQ /j

{

G

PDR

g

.

<

g.

.

w

.

.

2

Toledo Edison Company

June 7, 1983

date of this letter a written application to this. office to withhold such in-

formation. If yo'ur receipt of this letter'has been delayed such that less than

seven (7) days are available for your review, please notify this office promptly

so that a.new due date may beJestablished. Consistent with Section 2.790(b)(1),

any such application must be' accompanied by an affidavit executed by the owner

-of the information which identifies -the document or part sought to be withheld,

.and which~contains a full statement of the reasons which are the bases for the

~

. claim that the information'should be withheld from public disclosure.- This

section further requires the statement to address with specificity the con-

siderations-listed in 10-CFR 2.790(b)(4). The information sought to be withheld

shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted

above,.a copy of this letter, the enclosures, and your response to this letter

will be placed in the Public Document Room.

The. responses directed by this letter (and the accompanying Notice) are

'not subject to the clearance procedures of the Office of Management and

Budget as . required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C al* i #U'

4 .;g h,d Oi g ". 17

C. E. Norelius, Director

Division of Project and

Resident Programs

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No. 50-346/83-05(DPRP)

cc w/enels:

T. D. Murray, Station

~ Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

RII

RIII

RIII

f

m

J

tw/sv

-

as

.06/03/83[ J

4

6

O

\\$

.