ML20024A513
| ML20024A513 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/01/1983 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, DER-82-50, NUDOCS 8306170393 | |
| Download: ML20024A513 (2) | |
Text
'
"i L,
P200VED t!30 Arizona Public Service Company p g. g g PHOENIX, ARIZONA 85036 P.o. BOX 21666 l~ 3 jd,*9 3
June 1, 1983 ANPP-23944-BSK/R, U. S. Nuclear Regulatory Commission Region V.
Creekside Oaks Office Park
-1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1
Subject:
Time Extension. DER 82-50 A 50.55(e) Potentially Reportable Deficiency Relating to Flexible' Conduit Couplings Between Unit 1 Auxiliary and Control Buildings May Be Damaged If Seismic Event Exceeds 3/4-inch Movement I -
File: 83-019-0 26; D.4.33.2
Reference:
(A). Telephone Conversation between J. Eckhardt and G. Duckworth on September 10, 1982 (B) ANPP-21974 dated October 8,1982 (Interim Report)
(C) ANPP-22612 dated December 22, 1982 (Time Extension)
(D) ANPP-23417 dated April 4,1983 (Time Extension)
Dear Sir:
The NRC was notified of a.potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B) and Time Extensions 'were requested by. References (C) and (D). At that time, it was estimated that a Final Report would be available by May 31, 1983.
Due to the extensive investigation and evaluation required, it is now expected that this information will be. finalized by July 6, 1983, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, Nk (gg
~
E. E. V9n Brunt, Jr.
APS Vice President-Nuclear Projects Management ANPP Project Director EEVB/RQT:ru cc:
See Page 2 8306170393 830601 PDR ADOCK 05000528 IlO S
PDR I
.7147
~
- e ad U.-S. Nuclear Regulatory Commission Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C.~Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Cehr W. J. Stubblefield W. C. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Records-Center Institute of Nuclear Power Operations 1100 circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339
,