Docket No. 50-454
Docket No. 50-455
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers ro the routine safety inspection conducted by Messrs. W. Forney
and K. Connaughton of this office on March 1 through April 30, 1983, of
activities at. Byron Station, Units 1 and 2, authorized by NRC Construction
Permits No. CPPR-130 and No. CPPR-131, and to the discussion of our findings
with Mr. V. I. Schlosser and others of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures-and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is' required.
We are particularly concerned about the repetitive nature of the examples of
noncompliance identified during this inspection. Similar items of noncompli-
ance were identified in Inspection' Reports No. 454/82-07, No. 454/82-10 and
No. 454/82-22. In responding to these examples of nonco'mpliance please
specify what measures, in addition to those described in your responses to
'previously identified-items of this nature, will be established to provide the
necessary additional assurances that preoperational tests will be conducted in
accordance with test procedures and applicable test program requirements.
i-
1
!
.
I
-C306170359 830526
~
PEft ADOCK 05000454
A
f EO/
G
<
a
. .
.
.
4
2
Commonwealth Edison' Company
Based on our review of the nonconformance of liner seam welds, your tentative
disposition of that nonconformance and: interviews with Commonwealth Edison
personnel, we are concerned that identified nonconformances with FSAR commit-
ments which are dispositioned "use as is" may not be identified in the FSAR
as exceptions to those commitments. Please include in your response to this
letter, a description of actions _taken, or planned to be taken, to assure that
nonconformances so dispositioned are identified in the FSAR as exceptions to
applicable commitments,
in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
- in the NRC's Public Docucent Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within ten (10) days from the date of this letter of your intention to file a
request for withholding; and (b) submit within twenty-five (25) days from the
date of this letter a written application to this office to withhold such in-
formation. If your receipt of this letter has been delayed such that less than
seven (7) days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with Section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by.the owner
of the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4). The information sought to be withheld
shall be incorporated as far as possible into a separate part of the affidavit.-
If we do not hear from you in this regard within the specified periods noted
above, a copy of this letter, the enclosures, and your response to this letter
will be placed in the Public Document Room.
,
!
i
!
!
l
,
L
l
l
l
l
i
!
!
L .
-
.
,
.
-
3
Commonwealth Edison Company
May 26, 1983
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
OfIDIDGI $i39d D,y C 4 g;.g g,.j
C. E. Norelius, Director
Division of Project and
Resident Programs
'
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Reports
No. 50-454/83-18(DPRP)
No. 50-455/83-15(DPRP)
cc w/encls:
D. L. Farrar, Director
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
Philip L. Willman, Esq.
Assistant Attorney General
Environmental Control Division
Reed Neuman, Esq., Assistant
Attorney General
Ms. Jane M. Whicher
Diane Chavez, DAARE/ SAFE