Forwards IE Insp Repts 50-454/83-18 & 50-455/83-15 on 830301-0430 & Notice of Violation
ML20024A478
Person / Time
Site: Byron  
Issue date: 05/26/1983
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20024A479 List:
References
NUDOCS 8306170359
Download: ML20024A478 (3)


See also: IR 05000454/1983018

Text

'

-,-

- . .

"

.

.

I

MAY 261983

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers ro the routine safety inspection conducted by Messrs. W. Forney

and K. Connaughton of this office on March 1 through April 30, 1983, of

activities at. Byron Station, Units 1 and 2, authorized by NRC Construction

Permits No. CPPR-130 and No. CPPR-131, and to the discussion of our findings

with Mr. V. I. Schlosser and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures-and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is' required.

We are particularly concerned about the repetitive nature of the examples of

noncompliance identified during this inspection. Similar items of noncompli-

ance were identified in Inspection' Reports No. 454/82-07, No. 454/82-10 and

No. 454/82-22. In responding to these examples of nonco'mpliance please

specify what measures, in addition to those described in your responses to

'previously identified-items of this nature, will be established to provide the

necessary additional assurances that preoperational tests will be conducted in

accordance with test procedures and applicable test program requirements.

i-

1

!

.

I

-C306170359 830526

~

PEft ADOCK 05000454

A

f EO/

G

PDR

<

a

. .

.

.

4

2

Commonwealth Edison' Company

Based on our review of the nonconformance of liner seam welds, your tentative

disposition of that nonconformance and: interviews with Commonwealth Edison

personnel, we are concerned that identified nonconformances with FSAR commit-

ments which are dispositioned "use as is" may not be identified in the FSAR

as exceptions to those commitments. Please include in your response to this

letter, a description of actions _taken, or planned to be taken, to assure that

nonconformances so dispositioned are identified in the FSAR as exceptions to

applicable commitments,

in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

- in the NRC's Public Docucent Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to file a

request for withholding; and (b) submit within twenty-five (25) days from the

date of this letter a written application to this office to withhold such in-

formation. If your receipt of this letter has been delayed such that less than

seven (7) days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent with Section 2.790(b)(1),

any such application must be accompanied by an affidavit executed by.the owner

of the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4). The information sought to be withheld

shall be incorporated as far as possible into a separate part of the affidavit.-

If we do not hear from you in this regard within the specified periods noted

above, a copy of this letter, the enclosures, and your response to this letter

will be placed in the Public Document Room.

,

!

i

!

!

l

,

L

l

l

l

l

i

!

!

L .

-

.

,

.

-

3

Commonwealth Edison Company

May 26, 1983

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

OfIDIDGI $i39d D,y C 4 g;.g g,.j

C. E. Norelius, Director

Division of Project and

Resident Programs

'

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Reports

No. 50-454/83-18(DPRP)

No. 50-455/83-15(DPRP)

cc w/encls:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Philip L. Willman, Esq.

Assistant Attorney General

Environmental Control Division

Reed Neuman, Esq., Assistant

Attorney General

Ms. Jane M. Whicher

Diane Chavez, DAARE/ SAFE

I

R,6

RII

RII

RII

RIII

RIII

V va+I

.QJ

.Q

t

.

h

I

nnaughton/sv

t

Forney

Ha es

-

SLh

ghs)

Y 05/24/83

(

g.24 43

gj

i