W -
OPERATING D ATA REPORT DOCKET NO.
50-369 F f528 F DATE CO.\\lPLETED BY J. A. Reavis TELEPilONE 704-373-7567 OPERATING ST ATUS Notes
- NOTE: Nameplate Rating McGuire Unit 1
- 1. Unit N. me:
(Gross MWe) calculated as May 1,1983 - May 31,1983
- 2. Reporting Period:
1450.000 MVA x.90 power 3411
- 3. L.icensed Thennal Power tMwti:
factor per Page iii, 1305*
- 4. Nameplate IIsting (Grow MWe):
1180
- 5. Design Electrical Rating lNet.stWei:
- 6. Maximum Dependsble Capacity IGrow 31We):
1180
- 7. Maximum Dependable Capacity INet MWel:
S. If Changes Occur in Capacity Ratinp litems Number 3 Through 7) Since Lssi Report. Gise Reasons:
- 9. Power Level To Which Restricted.lf Any (Net MWe):
- 10. Reasons For Restrictions. lf A6y:
This Month Yr..to Date CumVative 744.0 3 623.0 13 127.0
- 11. Hours in Reporting Period 161.7 6 56.6 7 794.7
- 12. Number Of Hours Reactor Was Criticsl
- 13. Resetor Reserve Shutdown Hours 145.6 640.5 7 732.8
- 14. Ilours Generstar On Line
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (MWil) 187 441 1-044 613 14 547 031 59 352 353 219 4 979 810
- 17. Gross Electrical Energy Genersted (MWH) 41 155 298 567 4 619 890 IS. Net Electrical Energy Generated (MWil) 19.6 17.7 58.9
- 19. Unit Service Factor 19.6 17.7 58.9
- 20. Unit Avsilsbility Factor 4.7 7.0 29.8
- 21. Unit Cspacity Factor IUsing MDC Neti 4.7 7.0 29.8
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 67.4 32.3 23.3
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.snd Duration of Escht:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units la Test Sistus (Pr.ior in Conunercial Operation):
Forcesst Achiesed INITIA L CRITICA LITY
\\
INITIAL LLLClRICliY (2
COstMI;RCI A L Ol'ER A flON 8306170311 830615
~
(" M I PDR ADOCK 05000369 R
AVER.4GE D AILY UNIT ?OWER LEVEL 50-369 DCCKET NO.
Ly;7 McGuire Unit 1 6
._ 83 DATE COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 ay, 1983 310NT11 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LIVEL (3the-Neti (31We.Ner) 1 17 2
IS 3
19 4
20 4
5 21 6
2 7
3 3
24 9
3 10 25 l,
12
- S 26 2 13
- 9 524 14 209 30 31 9 is 347 3
509 16
!NSTRL'CTIONS Cn th:s icr=:t. list :ne v.er:ge f:tly 2. it ;;wer e. e: ;.,
- twe. Net :, e:e,.:.
. -. e.... ;. c ;.,.
^
.: r.e2 rest.vheie==;;w:::
ei - i
50-369 J
llNil SilU'IDOWNS AND POWl It IllIDUCllONS DOCK ET NO.
UNIT NAhlE McGuire Unit 1 DATE D/ID N H1:rOlt MONill May, 1983 COMPLE'I ED liy J. A. Reavis
'IELEPilONE. 704-373-7567
- 1 8
3.:
=_
r.
a
- EX l.itensee g -*,
c 9.
Cause & Currective ir N" -
DHe 9,
~?
,j
.i s cE livent
?7
$ ~$
Attiini to g3 E
,c2 j@
Itrport u Ji O gU Psevent f(ccursence F
o 11 83-05-01 S
60.33 H
ZZ ZZZZZZ Normal Heatup.
1J 83-05-03 S
45.67 B
SA PENETR Leak Test Guard Piping Around Hot Penetrations.
1K 83-05-05 S
50.23 H
ZZ ZZZZZZ Normal Heatup.
ll 83-05-07 S
140.95 B
RC ZZZZZZ Zero Power Physics Testing - Due,to Replacement of Burnable Poison Rod Assemblies.
2-P 83-05-13 S
B RC ZZZZZZ 30% Physics Testing.
2 83-05-15 F
291.25 A
1 SF VALVEX kepair Leaking Check Valves on B Cold Leg Accumulator.
3-P 83-05-28 S
B RC ZZZZZZ 50% Physics Testing.
3 83-05-29 F
3.38 B
3 IA ZZZZZZ Rx Trip Per Dynamic Rod Drop Trip Test.
4 83-05-31 F
6.55 A
3 CB INSTRU 2 of 3 Low Flow Signals in C Reactor Coolant Loop were lost due to faulty Test Box Used in Reactor Coolant Flow Test.
I 2
.I l
1 1.n cil iteason bicilnnl:
Exhibit C Insions-tiims S Siliololeil A lipopment li.ntme (1 splain) 1 M.mn.sl for Preparation ol' Data ll.ht.iinien.ini e us l'est 2.M.sn ual Sciain.
Ents) Sheets l'on 1.itensee C iteluelmg
.l. Anium.iiic St s.un.
livens kepini (l.liiti l'ile INUltl.G-D Itegulatin) Itcsin.u.ni l Olliei ll.xpl.sini O t til l l Unics.aios i s.nning;.5 18 cus.- l xannn.eu.nl l' A hinatinis.silic 5
G Oper.itional I nies (INplami lishihin 1 S.nne Source l'8/ / / )
11 Othes (lix > lam)
DOCKET NO:
50-369 UNIT:
McGuire 1 DATE:
6/15/83 NARRATIVE SUFMARY Month: May, 1983
-McGuire Unit 1 entered the month heating up following the steam generator modification outage. May 3 the unit was required to cooldown and conduct a leak test of the guard piping around the hot penetrations. This testing had not been included in the integrated leak rate test procedures. The testing was complete and normal heatup resumed on May 5.
Zero power physics testing which was required when the cracked burnable poison rod assemblies were replaced by thimble plugs began on May 7.
The unit power escalation was limited by further physics testing at 30% power.
May 15 the unit shut down to repair leaking check valves on the B cold leg accumulator. RepairswerecompletedandtheunitreturnedtoserviceMay28.
Power escalation was again limited by physics testing to 50%.
)
On May 29, the unit completed.50% physics testing and performed the dynamic rod drop trip test.
McGuire 1 returned to service May 30 and operated until May 31 when a bad test box switch used in the reactor coolant flow test tripped the unit. The unit was at 7.5% reactor power and increasing at the end of the month.
1 i.
5 i
l l
MONTHLY REFUELING INFORMATION REQUEST McGuire Unit 1 1.
Facility name:
2.
Scheduled next refueling shutdown:
January, 1984 3.
Scheduled restart following refueling:
March, 1984 4.
Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in N/A design or new operating procedures).
i i
i 7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:
29 l
l 8.
Present licensed fuel pool capacity:
500 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
DUKE POWER COMPANY Date:
June 15, 1983 704-373-7567 Name of
Contact:
J. A. Reavis Phone:
i I
L --
E O
McGUIRE NUCLEAR STATION Operating Status Report 1.
Personnel Exposure For the month of April, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
- 2..The total station liquid release contribution to whole body dose for April has been compared with the Technical Specifications annual value of 3 mrem; the total release for April was less than 10 percent.
The total station gaseous release contribution to any organ dose for April has been compared with the Technical Specifications annual value of 15 mrem; the total release for April was less than 10 percent of this limit.
~
OPERATING DATA REPORT 50-370 DOCKET NO.
DATE' 6-15-83 COhlPLETED BY J. A. Reavis TELEPHONE OPERATING STATUS McGuire Unit 2
- Notes: Nameplate Rating
- h. Reporting Period.
May 1, 1983 - May 31, 1983 (Gross Mwe) calculated as 10 1450.000 MVA x.90 power
- 3. Licensed Thermal Power OlWt1:
305*
factor per page 111,
- 4. Nameptate Rating (Gross SlWe):
1180 5.. Design E}4ctrical Rating (Net SIWE):
- 6. Maximum Dependable Capacity # Gross MWe):
1180
- 7. Maximum Dependable Capacity (Net MWel:
S. If Changes Occur in Capacity Ratinsts litems Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr..to Date Cumulative
!!. Hours in Reportmg Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours NOT IN COMMERCIAL OPERATION
- 14. Hours Generator On Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated iMWH) j
- 18. Net Electrical Energy Generated (MWH)
- 19. Uruc Service Factor
- 20. Unit Avadability Factor
- 21. Unit Capacity Factor iUsing *tDC Net)
- 22. Unit Capacity FactorIUsing DER Net)
- 23. Unit forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months IType. Date,and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status ePrior to Commercial Operation):
Forecast Achieved INITIAL CRITICA LITY 5/83 INITIAL ELECTRICITY 6/83 COMMERCIAL OPER ATION 3/84
.. ~
DuxIc Pownn GodintoT 18.0. IBOX lKllllD CII Altt,OITI', N.C. 215242 II AI. II. TUCKER TE t.E piton E tti F PetF.tDF1er (70-4) 37& 4531 June 15, 1983 n......
u
/ Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Document Control Desk Re: McGuire Nuclear Station Docket No.
50-369, -370
Dear Sir:
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of May, 1983.
Very truly yours, 46 M 2 hb Hal B. Tucker JAR:scs Attachments l
cc: Regional Administrator Mr. Ralph Birkel U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Washington, D. C.
20555 Atlanta, Georgia Mr. Phil Ross Mr. Bill Lavallee U. S. Nuclear Regulatory Commission Nuclear Safety Analysis Center MNBB-5715 P. O. Box 10412 Washington, D. C.
20555 Palo Alto, California 94303 INPO Records Center Senior Resident Inspector Suite 1500 McGuire Nuclear Station 1100 Circle 75 Parkway Atlanta, Georgia 30339 d
/
)h