ML20024A356

From kanterella
Jump to navigation Jump to search
Advises That No Check Valves Installed in Steam Generator Cooling Water Piping Flow Path,In Response to IE Bulletin 83-03, Check Valve Failures in Raw Water Cooling Sys of Diesel Generators.
ML20024A356
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 06/07/1983
From: Giesler C
WISCONSIN PUBLIC SERVICE CORP.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CON-NRC-83-117, REF-SSINS-6820 IEB-83-03, IEB-83-3, NUDOCS 8306170056
Download: ML20024A356 (1)


Text

NRC-83-117 MA WISCONSIN P U B LI C S E RVICE CO RPORATIO N RO. Box 1200, Green Bay, Wisconsin 54305 June 7, 1983 Mr. J. G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Ccmnission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant IE Bulletin 83-03: Check Valve Failures in Raw Water Cooling Systems of Diesel Generators In response to the " Required Actions for Holders of Operating Licenses" in the reference IE Bulletin:

A review of drawings and a physical walkdown of cooling water piping for the Diesel Generators has verified that there are no check valves in this flow path. Therefore, the requested actions are not applicable to Kewaunee Nuclear Power Plant.

Approximately two (2) hours of staff time was expended to prepare this response.

Very truly yours, C. W. Giesler Vice President - Nuclear Power js cc - Mr. S. A. Varga, US NRC Mr. Robert Nelson, US NRC 8306170056 830607 PDR ADOCK 05000305 G PDR ly Af//