Forwards IE Insp Rept 50-341/83-10 on 830301-0430.No Noncompliance Noted
ML20024A349
Person / Time
Site: Fermi 
Issue date: 05/27/1983
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wells D
DETROIT EDISON CO.
Shared Package
ML20024A350 List:
References
NUDOCS 8306170049
Download: ML20024A349 (2)


See also: IR 05000341/1983010

Text

4

e'

AfAY 271999

Docket No. 50-341

The Detroit Edison Company

ATTN:

Mr. Donald A. Wells

Manager, Quality Assurance

2000 Second Avenue

Detroit, MI 48226

Centlemen:

This refers to the routine safety inspection conducted by B. H. Little and

P. M. Byron of this office on March 1 through April 30, 1983, of activities

at Enrico Fermi Nuclear Power Station, Unit 2, authorized by NRC Construction

Permits No. CPPR-87 and to the discussion of our findings with Mr. E. Griffing

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

l

l

i

l

!

i

~

8306170049 830527

[

PDR ADOCK 05000341

7d /

G

PDR

I

.

.

,,

- _ -.

_ - , _ - .

.

_

.

.

MAY 271983

The Detroit Edison Company

We vill glar'ly discuss any questions you have concerning this inspection.

Sincerely,

00rigir al cigacd by P., C. Knop

R. C. Knop, Chief

Projects Branch 1

Enclosure:

Inspection Report

No. 50-341/83-10(DPRP)

cc w/ encl:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Harry H. Voigt, Esq.

I

I

f

i

RIII

RIII

RIII

kE0

h

GCL

Little/j

-

-Konklin

Knop

f

4/$4//s

Y

Y#

p1lD

e5/3/03