OPERATLNG DATA REPORT t
50-317 DOCKET NO. _6/14/83 DATE COMPLETED BY Elaine Lotito TELEPHONE (301) 7A7-5363 OPERATING STATUS
~
Calvert Cliffs No. 1 Notes I. Unit Name:
May, 1983
- 2. Reportmg Period.
- 3. Licensed Thermal Power (Mbt):
2,700 918
- 4. Nameplate Rating (Gross MWel:
O'
- 5. Design Electrical Rating (Net Mbe):
860
- 6. Maximum Dependable Capacity (Gross MWes:
823
- 7. Mahimum Dependible Capacity (Net MWe).
- 8. If Changes Occur in Capscity Ratings (Itc.ns Nunter 3 Through 7) Since Last Report.Gise Reasons.
- 9. Power Lesci To bhich He,tricted,if Any INet Athd:
- 10. Reasons For Restnctio:a. lf Ans :
Ihis Month Yr.to-Dat?
Curnubtise
- 11. Ilours in Reporting Period 744 3,623 70,692
- 12. Numtcr Oiliours Reactor Was Critica!
744.0 3,430.5 56,526.4
- 13. Reactor Rescrse Shutdown liours 0.0 11.8 1,820.3 14.11ours Generator On-Line 744.0 3,414.0 55,437.9,
- 15. Unit Resene Shutdown linurs 0.0 0.0 0.0
- 16. Gross Thermal Energy Gererated IMWill 1,986,562 9,036,144 135,706,190
- 17. Gross Electrical Energy Generated (MWill 672,503 3,061,816
__ 44,662,759
- 18. Net Electrical Energy Generated (MWHi 645,582 2,933,659
_ 42,597,867
- 19. Unit Service Factor 100.0 94.2 78.4
- 20. Urut Asastability Factor 100.0 94.2 78.4 105.2 98.2 74.2
- 21. Unit Capacity Factor (Using MDC Ner 102.7 95.8 71.3
- 22. Unit Capacity Factor IUung DER Ncti
- 23. Urit Iorced Outage R:te 0.0 2.4 7.7
- 24. Shutdowns Scheduled O,cr Nest 6 Months t Type. Date.and Duration of Eacht-
- 25. If Shut Down At End Of Repert Period.Istimated Date of Startup.
- 26. Units in Test Status IPrior to Commercial Oper. tion).
Forecut Achieved INITIA L CRI TICA LITY INITl4L ELEC TRICIYY COMMERCI AL OPER ATION 8306170018 830614 ~
hg k' PDR ADOCK 05000317 R
PDR ll
k-.
OPEAATING DATA REPORT DOCKET NO. _50-318 DATE __6/14/83 COMPLETED BY Ela'ine Lotito TELEPliONE (3Ui) /oi-5363 OPERATING STATUS Calvert Cliffs No. 2 Notes
- 1. Uni: Name:
- 2. Rerorting Period:
May,_1983
~'2'700
- 3. Licensed Therm.il Powur 4MW ):
- 4. Namepla:e Rating (Gro>s MWeL 911
- 5. Dessa Eb tri,2! Rairng (Net Mbe):
845 860
- 6. Masimum Dependable Ccpacity (Gross MWel:
825
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capscity Ratings (Irems Nur,ter 3 Through 7) Since Last Report. Gi'e Reasons.
- 9. Power Lesel To bhiet He tricted if Any thet 4tha:
- 10. Rea>ar.s For Restnctm:a lf A,y :
This Month Yr..to Date Cumulative 744 3,623
_ 54,047 it, ilours in Reporting P.riod
- 12. Number Of liours Reictor Was Critical 744.0 3,219.2 45,320.1
- 13. Reaeter Res;r*e S$urdown Ifours 0.0 95.6 890.8
.14. Ifours Generator On.Line 730.8 3,061.4 44,604.3
- 15. Unit Resene Shutdown flours 0.0 0.,0 0.0
- 16. Grass Therrnal Enern Generated IMhlt) 1,931,064 7,944,147 110,164,904
_ -34,530 6
- 18. Net Electrical Energy Cenerated IMWh, 607,580 2,630,126
__ 36,286,330
- 17. Cross Electrical Energy Generated I\\tWlf) 2,508,729
__ 34,599,491
- 19. Unit Senice Factor 98.2 84.5 82.5
- 20. Urut Autlability Factor 98.2 84.5 82.5
- 21. Unit Capacery Factor (Usmg \\f DC Nets 99.0 83.9 78.2
- 22. Unit C:pacity Factor stuq DER Nerl 96.6 82.0 75.8
- 23. Urit Forced Ourage Rue 1.8 3.5 5.4
- 24. Shutdowns Schedu!cd 0 cr Nest 6 Months (Type. Date,and Duration of Each t:
- 25. If Shut Down At End Of Report Perinf. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Oper,rionL Forecast Achiesed INITIA L CRITICA LITY INITI 4 L El EC TRICITY COM\\lERCl 4 L OPE R A TION 6/~7 )
AVER AGE D tlLY UNIT P0hER LEVEL 50-317 DOCKET NO.
ggfalvertCliffsNo. 1 DATE 6/14/83 COMPLETED BY TELEPflONE(301) 787-5363 May, 1983 MONUl DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY P0hER LEVEL IMWe Net)
(MWe Net 1 879 M8 y.
37 2
878 871 gg 3
877 in 875 878
,875 4
0 5
871 873 21 863 873 6
22 7
852 23 872 8
854 871 74 g
858 871' 25 873 872 10 26 874 869 II 27 12 875 825 yg 876 869 13 14 877 870 30 840 860 15 3g I6 869 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compete to the nearest whole mepwatt.
l'Il77 )
AVERAGE D AILY UNIT POWER LEVEL 50-318 DOCKETNO.
UNIT alvert Cliffs No. 2 C
DATE 6/14/83 Elaine Lotito COMPLETED BY TELEPHONE (301) 787-5363 MONTH May, 1983 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (Mhe Net)
IMwe.Neig 848 846 i
7 2
857 18 847 3
856 19 845 4
854 20 846 5
853 21 847 852 849 6
22 7
854 23 847 854 845 8
24 9
852 844' 25 10 851 26 843 II 850 27 841 12 850 843
- g 850 824 13 29 764 843 14 39 15 393 834 33 429 16 INSTRUCTIONS On this format, list the aversge daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole nwpwatt.
19/771 m
0-317 DOCKET NO.
UNITSHUTDOWNS AND POWER REDUC 110NS UNIT NAME Calvert Cliffs No. 1 DATE b/14/63 REPORT MONTil May, 1983 COMPT.ETED BY Elaine Lotito TE1.EPHONE (301) 737-5363 i
~
5 c-r.
5
.2 e s
7.e X Licensee ce c4 Cause & Corrective E
Action to No.
Date k
3g i
.555 Event 5$
f'l
$E 5
jig Repose ar
<N 0 Prevent Recurrence d
No outages or reductions.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain)
I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C. Refueling 3-Automatic Scram.
Event Report (l ERI File (NUREG-D Regulatory Restriction 4econtinuation 0161) li Operator Training A License Examination 5-Load Reduction F Administrative 5
9-Other G-Operational Error (Explain)
Exhibit I Same Source 19/77)
Ilother (E splain)
DOCKET NO. 50-318 UNITSHUTDOWNS AND POWER REDUCT10NS UNITNAME Calvert c14fre No. 2 DATE 6/14/83 REPORT MONTH May, 1983 COMPLETED BY Elaine Lotito Uol) 167-5363 TELEPHONE e.
?
E
.$ g 3
j E3 Lwensee
,E =,
[*?
Cause & Corrective N. i.
Date h
~g
(
235 Esent g'
Attum to g'
Pievent Recurrence y:
5
~g=
Report a mV H
o
?
u b
83-04 830515 F
13.2-A 1
XX ZZZZZZ Indication of low oil level in No. 22 A reactor coolant pump.
l 2
3 4
F: Forced Reason.
Methm!:
E thibit G - lastructions S: Scheduled A Equrpment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refuelir.g 3-Automatic Scram.
Esent ReporI (LER) File (NUREG-D.Itegulatory Restriction 4sContinuation 0161) li Operator Training & Licens: Examination 5-Load Reduction F Ademnistrative 5
9-Other G4hwe.stional Es vor (Esplarn)
Exhibii 1 - Same Source Il44 her (Explain)
(9/77) t
June 14, 1983 REFUELING INFORMATION REQUEST 1.
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 2.
Scheduled date for next Refueling Shutdown: September 30,1983
' 3.
Scheduled date for restart following refueling: December 1,1983 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
1 September 1,1983 6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuel inserted into the previous cycle.
7.
The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool.
.(a) 217 (b) 732 Spent Fuel Pools are common to Units 1 and 2 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblics.
1830 Licensed 1358 Currently Installed 9.
The projceted date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
June'14, 1983 REFUELING INFOll11ATION REQUEST 1.
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2, 2.
Scheduled date for next refueling shutdown: April 20,1984.
-3.
Scheduled date for restart following refueling: June 10,1984.
4.
Will refueling or re umption of operation thereafter require a technical specification change or other licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such L3 to allow operation of the plant with a fresh reload batch and reshuffled core.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
.ilarch 3,1984
.6.
Important licensing considerations associated with refueling.
lleload fuel will be similar to that reload fuel inserted in the previous cycle.
- 7..The number of fuel assemblics (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217 (b) 732 Spent l'uci Poolis common to Units 1 and 2.
- 8.. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
1830 Licensed 1358 Currently Installed 1
- 9. - The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991 s
a
[,
4 w'--
-"-~^~'""F"'~'
SUMMARY
OF UNIT 1 OPERATING EXPERIENCE MAY 1983 5/1 At the beginning of this reporting period, Unit 1 was operating at 910 MWe with the reactor at 100% power.
5/5 Decreased load to 835 MWe at 2200 to replace oil in 12 Circulating Water Pump.
5/6 Load was increased to capacity (910 MWe) at 405. At 2200 load was decreased to 885 MWe to conduct Core Physics testing.
5/9 Load was increased to capacity (910 MWe) at 1900.
5/15 At 0608 load was decreased to 745 MWe to test Main Turbine Control Valves. Load was increased to capacity (910 MWe) at 1300.
5/17 At 405 load was decreased to 760 MWe to investigate Main Turbine Control Valve tightness problem. Load was increased to capacity (905 MWe) at 0740.
5/28 At 0605 load was decreased to 760 MWe to test Main Turbine Control Valves. Load was increased to capacity (910 MWe) at 1500.
5/31 At the end of this reporting period, Unit I was operating at 895 MWe with the reactor at 100% power.
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE MAY 1983 5/1 At the beginning of this reporting period, Unit 2 was operating at 890 MWe with the reactor at 100% power. At 0030 load was decreased to 720 MWe to test Main Turbine Control Valves. Load was increased to capacity (890 MWe) at 0445.
5/14 Decreased load to 720 MWe at 0500 in preparation for Amertap inspections.
5/15 The reactor was shutdown at 1030 to check oil level in 22A Reactor Coolant Pump.
5/16 At 0357 Unit was started up and paralleled to the Grid. Load was increased to 740 MWe at 1515. At 1600 load was decreased to 700 MWe while repairing 21 MSIV Accumulator. Resumed full load operation (875 MWe) at 2000.
5/29 At 0020 load was decreased to 770 MWe to test Main Turbine Control Valves. Load was increased to capacity (880 MWe) at 0845.
5/31 At the end of this reporting period, Unit 2 was operating at 875 MWe with the reactor at 100% power.
BALTIMORE GAS AND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 FOSSIL POWER DEPARTMENT June 14, 1983 Director Office of Inspection and Enforcement U. S. Nuclear Regualtory Commission Washington, D.C.
20055 ATTENTION: Document Control Desk Gentlemen:
Enclosed herewith is the May 1983 - Operation Status Report for Calvert Cliffs No. 1 Unit, (Docket.50-317) and Calvert Cliffs No. 2 Unit, (Docket 50-318).
Sincerely,-
9
- E E. 10. Lotito Performance Data Analyser
[
Production Economy and Results Unit Fossil Power Department Enclosure cc:
Messrs W. Lavallee J. Tiernan C. McCabe, Jr.
R. Architzel P. Krause L. Russell P. Ross P. Sierer, Jr.
M. Beebe C. Shoemaker D. Reilly R. Ash Dr.
S. Long V. Stricklin A. Lundvall i
EML/bew
_ wP(NCR) 4 1-h6y I