ML20024A321

From kanterella
Jump to navigation Jump to search
Public Version of Temporary Mod Request T-7111 to Emergency Plan Implementing Procedure AD 1827.10, Offsite Dose Calculations. Rev 174 to Rev Index Encl
ML20024A321
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/12/1983
From: Downing G
TOLEDO EDISON CO.
To:
Shared Package
ML20024A319 List:
References
AD-1827.10, NUDOCS 8306160690
Download: ML20024A321 (3)


Text

w _.

THE TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PLAN SUPPORTING PROCEDURES REVISION INDEX PAGE REVISION PROCEDURES REVISION TEMPORARY MODIFICATIONS i

7 HP 1602.01 12 HP 1604.01 4

HP 1604.02 0

AD 1827.01 3

AD 1827.02 9

AD 1827.03 2

AD 1827.04 2

AD 1827.05 2

AD 1827.06 2

AD 1827.07 2

T-6605 AD 1827.08 1

AD 1827.09 1

AD 1827.10 12 T-6491 T-7111 AD 1827.11 AD 1827.12 9

AD 1827.13 3

AD 1827.15 AD 1827.16 1

AD 1827.17 4

AD 1850.04 5

AD 1850.05 6

AD 1850.06 0

ADMINISTRATIVE MEMORANDUMS REVISIO::

No. 37 ECS Pager and Telephone Nu=bers 30 No. 38 Pirst Aid Team 12 13 No. 39 Tire Brigade No. l.1 Emergency Duty Officer (EDO) 3-No. 42 Radiation Monitoring Teams (R'E) 19 9

Revision 174

April, 1983 h

8306160690 830606 PDR ADOCK 05000346 F

PDR

S -e Di TRIIUTioN original, Responsill)Section Head A* tion i

/

File Copy, Meeter File CoPI S To BE Mo IED FoR IMMEDIATE IMPt.EMENTATioN DAVIS-BESSE NUCLEAR POWER STATION - UNIT 1 TEMPORARY MODIFICATION REQUEST ED 6926 SECTION 1 PROCEDURE TITLE AND NUMBER

=

AD 1827.10 Offsite Dose Calculations REASON FoR CHANGE Incorporate use of Prime Computer for performing dose calculations.

CHANGE C

_ AdcLthe following note _to_ sect 16n.4 prior to section.4.1.

Note: Dose calculations may performed using the Prime Computer.

Instructions for accessing the Prime can be found at the ECC terminal and the Control Room terminal, IS PROCEDURE REVISloN REQUIRED Yes X

No if no, this modification is valid until

^*

William L. Yarosz 3/22/83 APPROVED BY DATE s NWh b

D b

171 S.k :

4 s=23 APPROVED BY DATE SU8MITTED BY ection Head)

DATE

.t

/We l' /'

DATE

/

REcoMMENDEh 8 (SRB Chairman) 4/sjaa A +m

~

QA APPROVED Ikh (M of Assurance)

DATE

/

f #l P i APPROVED BY (Station Superintendent)

DATE y

m., n.:~- m 4/i u j; ;

i

DAVIS-BESSE REVISION COVER SHEET s}

O April 18, 1983 DATE T0:

l_.LclM )

// f l'd.A.

IGh EMERGENCY PIRIN NG & PREPAREDNESS SUPV.

FROM:

EMERGENCY PLAN SUPPORTING PROCEDURES Manual Changes

SUBJECT:

Davis-Besse This letter transmits additions and revisions to the Davis-Besse EMERGENCY PLAN SUPPORTING PROCEDURES Manual. Control Copy fdd..

Instructions for the material are as follows:

REMOVE AND RETURN INSERT Revision Index, Rev. 172 Revision Index, Rev. 173 T-7111 in front of AD 1827.10 Date Revision Entered b

Addressee Signature RETURN TO THE OFFICE MANAGER - STOP #3050 5 U5535'nU2[n4"5A C,

--g

---