Advises That NRC Will Revise Draft Integrated Plant SAR Reflecting Addl Info Provided by Licensee,Responding to Recommendations & Comments Made by NRC Consultants & Incorporating Licensee Schedular Commitments
ML20024A145
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/08/1983
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Ebersole J
Advisory Committee on Reactor Safeguards
Shared Package
ML20023D665 List:
References
NUDOCS 8306150490
Download: ML20024A145 (4)


Text

7 goJJ3 1

GREEN TICKET ED0013139

/

i.

l' ' SECY-83-1836 m

7 I

T5F M

DISTRIBUTION,_

' 4.

jDocument Controll JDayis NRC PDR RMinogue L PDR JHeltemes PRC System GCunningham JUN 8 1983 PPAS SEPB Reading TSpeis WTRussell RMattson CGrimes RVollmer FMiraglia/LBerry HThompson DEisenhut/MJambor NGrace Mr. Jesse C. Ebersole. Acting Chairman EGCase BSnyder Advisory Committee on Reactor Safegua'rds ~

HRDenton DCrutchfield l

U.S. Nuclear Regulatory Commissi.on '

WDircks PErickson Washington, DC 20555 JRoe SBrown TRehm MBridgers(ED0#13139)

Dear Mr. Ebersole:

VStello MGarver (ED0#13139)

RDeYoung In your letter to Chairman Palladino dated May 17,1983, the ACRS presented its views on the Systematic Evalua' tion Program as applied ano presented in the draft Integrated Plant Safe ~ty, As.sessment,d the staff's positions.

Report (IPSAR) for the Haddam Neck Plant. In summary, that 1,etter, supporte The staff will revise the draft IPSAR,,to reflect the additional information provided by the licensee, respond to the reconnendations and coments made by the staff's consultants, and incorporate the licensee's schedular comitments. The final IPSAR will. also confirm that there are no areas of disagreement remaining between the staff.and licensee, as discussed during

~

the ACRS meeting.

Sincerely.

(SignemWilliam1.Dirchs William J. Dircks Executive Director for Operations 8306150490 830608 PDR ADOCK 05000213 O

PDR SEE PREVIOUS CONCURRENCE FOR INITIALS

,)

reggRep DL:SEPB*

DL:SEPB*

DL:AD/SA*

DL*

NRR*

NRR (A7}ED0 EgbW 5.E.E.S..:.iE.

. 5 5U.i Ei.'.".. 5.15 y {a"'

.p,[',jsj,@,,',',',', i,d,5j",',',",',',', BEM,',',',',',', ',p,{p,j35,',',',',

i

"">.9.5/.2,?/8,3...,gsf 27/,8,3..,,,,ps/,2,7/,83,,,,,,,9,s/,2,?/,83,,,,,,,9,s,/,9,2/,83

,,pg,ja3,,, s/,,{/,83,,,,,,,,,

NRC FORM 318 H&801 NRCM O240 OFFICIAL RECORD COPY

  • u.s. GPO 1983-400-247 y

.~.

.n

+ -,

/_

_s

m DISTRIBUTION HDenton RVo11mer ECas3 HThompson DEisenhut Grace

'i WDircks

/BSnyder JRoe

/ SECY-83-1836 ED0-83-1836 TRehm VStello MBridgers-83-1836 RDeYoung

/

MGarver-83-1836 DDavis FMiraglia Mr. Jesse C. Ebersole. Acting Chairman RMinogue WRussell Advisory Committee on Reactor Safeguards JHeltemes CGrimes i

U. S. Nuclear Regulatory Comission GCunningham SBrown Washington, D.C.

20555 Central Files PErickson PPAS DCrutchfield

Dear Mr. Ebersole:

TSpeis SEP File

-Ritattson

/

In your letter to Chairman Palladino dated May 17, 1983, the ACRS presented its views on the Systematic Evaluation Program _as applied and presented in the draff Integrated Plant Safety Assessment Report,(IPSAR) for the Haddam Neck Plant.

In sumary, that letter support @w-the staff's positions.

The staff will revise the draft IPSAR to reflect the additional information provided by the licensee, respond to the,recomendations and comments made by the staff's consultants, and _ incorporate the licensee's schedular commit-ments. The final IPSAR will also confirm that there are no areas of disagree-ment remaining between the staff and licensee, as discussed during the ACRS meeting.

Sincerely, Harold R. Denton, Director Office of Nuclear Reactor Regulation l

i l

l m

j&

,,p,, D,,,,,

Df:

..D,: N M.:.96 5 #....S E P B,;,p,(,,,,,,

DL,,,,

...HQk,RR,,_,,,

omc.,

suRnae)...CGr.imes:dk.

..MRussell...

[,,,1.ia.....QE ut.

. EC y..

on...

am>.. sips 3..........si.Qi.83......

sa.......s?l.i.83....

... y..Y.i83..

. 61.>481....

I NRC FORM 318 (10-80) f4RCM 0240 OFFiC1AL RECORD COPY usago mi_m.w.

s i

.e..... m.,..,.......

,,a,,,,,.,,,...,

FROM-ACTION CONTROL DATES CONTROL NO

~uun 13139 ACE m uet ocAotiNt Jesse C. Ebersale. Acting Chatruen oATE Or oOCuMEET INTERJM REPLY

'O-PREPARE FOR SIGNATURE

/j/ h..,,j,,

OF; b\\Mn Nil 4djM FINAL REPLY FILE LOCATION I' /Y[

j E

R OR OTHER DFSCRIPTION LETTER O utuO O RcPORT O OTHER SPECIAL INSTRUCTIONS OR REMARKS ACR$ Report en The Systematic Evaluetten Program Review of the Heddam Neck Meet ASSMaNCD TO DATE INFORMATION ROUTING De ten, saa for @7/83 Dircks Case /Dentpn

_AtTiter, ACTION Ape 1.

Speil SECY-83-1836 PPAS

_Eisenhut 5L18/83_

Rehm 2.

s 61.

Stelle 3.

Mattson

/

/b' -

Defe##9 4.

Vollmer au

</

Davis 5.

T % son

/ /

Minogue 6.

Grace Heltamos 7.

Shyder GCenals i,

Centen1 fles e

NRC FORM 232 EXECUTIVE DIRECTOR FOR OPERATIONS (6J!O)

PRINCIPAL CORRESPONDENCE CONTROL 4

F T

l

~

m o

y m m m 0

t t t

O 23

,3 g-8

[]!i[

r ega E

i

}9 !n!.!

Mr 34 8

ey

!g 8

a-8 a-8.

G 79 9

00 21 a-t

[p ps:

w h,g 8

3r 5

E ET a

=

n w

$. E-3 E.5 8

Tu n E 3;

z a

3-2 o

e 3

?-.

g 8

P o

a y

c a

n w

o

=5 G

9 g

j u

6 r

=

7 3

E 4 2 8 j

E O de=

=

.- s.

s w

v n

m.

3

~

g a

:.a

".o

?

a e

3 s

g n*

a 3-a

o*=

ii

!A*fD liFEy 1,

~ : i M

H !53~e i

n o

c E !;a,g*

mo

=

a

j'q 5-8 E l>

E 3

=

m Q

6 5.

3 x

g q

o z

=

< w a

o, s,

=

w C

3 O

M Q

t 2

6 o

s

.. -