Forwards IE Insp Rept 50-286/83-08 on 830412-15.No Noncompliance Noted.Corrective Actions Re Violations Noted in 830117 & 0217 Ltrs Verified
ML20023E033
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 05/23/1983
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20023E034 List:
References
NUDOCS 8306060264
Download: ML20023E033 (2)


See also: IR 05000286/1983008

Text

. >

.

MAY 2 3 1983

Docket No. 50-286

Power Authority of the State of New York

Indian Point 3 Nuclear Power Plant

ATTN: Mr. J. C. Brons

Resident Manager

P. O. Box 215

Buchanan, New York 10511

Gentlemen:

Subject:

Inspection Report No. 50-286/83-08

This refers to the routine safety inspection conducted by Mr. P. Clemons of

this office on April 12-15, 1983 of activities authorized by NRC License No.

DPR-64 and to the discussions of our findings held by Mr. Clemons with you and

other members of your staff at the conclusion of the inspection, and to a

subsequent telephone discussion between Mr. Clemons and Mr. Quinn on April 18,

1983.

Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, measurements made by the inspector, and

observations by the inspector.

Our inspector /.lso verified the steps you have taken to correct the violation

and the inspector followup item brough to your attention in letters dated

January 17, 1983 and February 17, 1983. We have no further questions regarding

your action at this time.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed ir the NRC Public Document Room unless you notify this office,

by telephone, witnin ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

The telephone notification of your intent to request with-

holding, or any request for an extension of the 10 day period which you believe

necessary, should be made to the Supervisor, Files, Mail and Records, USNRC

Region I, at (215) 337-5223.

9

0FFICIAL RECORD COPY

h

8306060264 830523

PDR ADOCK 05000286

\\

O

PDR

. - -

- . _ -

_

_ - _ .

- - - - - - - .-

.

._ _

_

- _ _ _ .

.

.

Power Authority of the State

of New York

2

MAY 2 31983

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

'

ORIGIKAL SIGNED d

k. h01{h

ThomasT. Martin,Direc/

tor

Division of Engineering and

Technical Programs

Enclosure: NRC Region I Inspection Report Number 50-286/83-08

cc w/ encl:

L. W. Sinclair, President and Cnief Operating Officer

J. P. Bayne, Executive Vice President-Nuclear Generation

C. M. Pratt, Assistant General Counsel

A. Klausmann, Vice President - Quality Assurance

D. Halama, Quality Assurance Superintendent

G. M. Wilverding, Chairman, Safety Review Committee

K. Burke, Director, Regulatory Affairs (Con Ed)

NRC Licensing Project Manager

Dept. of Public Service, State of New York

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New York

NRC Resident Inspector

bec w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encls)

DPRP Section Chief

,

!

RI:DETgP'

RI:DETP

RI:DETP

I:DETP

<

'

Clemorfs/pja

Shan ky

e

my

Mar in

5/19/83

e

) 28

N

OFF CIAL RECORD C Y

pp