Notice of Violation from Insp on 830405-0502
ML20023D962
Person / Time
Site: Beaver Valley
Issue date: 05/23/1983
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20023D959 List:
References
50-334-83-08, 50-334-83-8, NUDOCS 8306060204
Download: ML20023D962 (1)


Text

- -

(

\\.

APPENDIX __A_

NOTICE OF VIOLATION Duquesne Light Company Docket No. 50-334 Beaver Valley Unit 1 License No. DPR-66 As a result of the inspection conducted on April 5 - May 2,1983, and in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register on March 9, 1982 (47 FR 9987), the following violation was identified:

Technical Specification Surveillance Requirement 4.5.2.b, Emergency Core Cool-ing Systems, requires that each testable power operated valve in the flow path be fully cycled at least once per 31 days to demonstrate operability.

Contrary to the above, as of April 22,1983,MOV-SI862AandB(thelowhead safety injection pump suction valves from the Refueling Water Storage Tank),

which are testable power operated valves in an Emergency Core Cooling System flow path, were not being cycled on a 31 day frequency to demonstrate opera-bility.

This is a Severity Level IV Violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby re-quired to submit to this office within 30 days of the date of the letter transmit-ting this Notice, a written statement or explanation in reply, including for each violation:

(1) the corrective steps which have been taken and the results achieved; (2) the corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consi-deration will be given to extending the response time.